IAC logo
IAC Assessment: DS0065
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0065
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1996
Principal Product Distilled Liquor
NAICS n/a
SIC 2085 - Distilled And Blended Liquors
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 225,000
Annual Production 5,475,000 Pieces
Production Hrs. Annual 6,864
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,579 2,473,623 kWh $0.03
Electricity Demand $43,293 5,604 kW-months/year $7.73
Electricity Fees $4,401 - $ -
Natural Gas $62,844 13,503 MMBtu $4.65
TOTAL ENERGY COSTS $212,171
RECOMMENDED SAVINGS* $73,775 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,041
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$616
Cost:
$11,156
$306 9,379 $310 40 - - - - - - $306
9,379
kWh
$310
40
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,358
Cost:
$9,190
$2,293 70,340 $1,065 144 - - - - - - $2,293
70,340
kWh
$1,065
144
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,545
Cost:
$2,161
- - - - $2,545 - - - - - -
-
kWh
-
-
kW-months/year
$2,545
-
$
-
-
MMBtu
-
-
Tgal
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$812
Cost:
$225
$812 24,912 - - - - - - - - $812
24,912
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,067
Cost:
$683
- - - - - - $3,067 659 - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,067
659
MMBtu
-
-
Tgal
06: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$2,576
Cost:
$4,603
$(-6) (-293) $(-46) (-2) - - - - $2,628 1,200,000 $(-6)
(-293)
kWh
$(-46)
(-2)
kW-months/year
-
-
$
-
-
MMBtu
$2,628
1,200,000
Tgal
07: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$60,801
Cost:
$21,060
- - - - - - $60,801 13,064 - - -
-
kWh
-
-
kW-months/year
-
-
$
$60,801
13,064
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$73,775
Cost:
$49,078
$3,405 104,338 $1,329 182 $2,545 - $63,868 13,723 $2,628 1,200,000 $3,405
104,338
kWh
$1,329
182
kW-months/year
$2,545
-
$
$63,868
13,723
MMBtu
$2,628
1,200,000
Tgal
TOTAL IMPLEMENTED Savings:
$7,041
Cost:
$21,029
$2,599 79,719 $1,375 184 - - $3,067 659 - - $2,599
79,719
kWh
$1,375
184
kW-months/year
-
-
$
$3,067
659
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal