IAC Assessment: DS0067
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0067
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1996
Principal Product Cheese and Whey
NAICS n/a
SIC 2022 - Cheese, Natural And Processed
Sales $50,000,000-$100,000,000
# of Employees 50
Plant Area (Sq.Ft.) 39,478
Annual Production 52,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,759 5,102,579 kWh $0.03
Electricity Demand $33,228 12,264 kW-months/year $2.71
Electricity Fees $16,237 - $ -
Natural Gas $144,182 70,110 MMBtu $2.06
TOTAL ENERGY COSTS $601,490
RECOMMENDED SAVINGS* $28,263 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,156
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$444
Cost:
$4,230
$351 10,258 $93 20 - - - - - - $351
10,258
kWh
$93
20
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,024
Cost:
$14,718
$4,122 120,164 $902 192 - - - - - - $4,122
120,164
kWh
$902
192
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,310
Cost:
$8,238
$222 6,448 $49 11 - - $5,039 2,446 - - $222
6,448
kWh
$49
11
kW-months/year
-
-
$
$5,039
2,446
MMBtu
-
-
Tgal
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,685
Cost:
$6,735
- - - - $9,685 - - - - - -
-
kWh
-
-
kW-months/year
$9,685
-
$
-
-
MMBtu
-
-
Tgal
05: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$7,027
Cost:
$2,390
$(-12) (-293) - - - - - - $7,039 3,983,616 $(-12)
(-293)
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$7,039
3,983,616
Tgal
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$773
Cost:
$900
- - - - - - - - $773 436,800 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$773
436,800
Tgal
TOTAL RECOMMENDED Savings:
$28,263
Cost:
$37,211
$4,683 136,577 $1,044 223 $9,685 - $5,039 2,446 $7,812 4,420,416 $4,683
136,577
kWh
$1,044
223
kW-months/year
$9,685
-
$
$5,039
2,446
MMBtu
$7,812
4,420,416
Tgal
TOTAL IMPLEMENTED Savings:
$17,156
Cost:
$13,355
$339 9,965 $93 20 $9,685 - - - $7,039 3,983,616 $339
9,965
kWh
$93
20
kW-months/year
$9,685
-
$
-
-
MMBtu
$7,039
3,983,616
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal