IAC logo
IAC Assessment: DS0068
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0068
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1996
Principal Product Silos and Silo Unloaders
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 93,843
Annual Production 850 Pounds
Production Hrs. Annual 4,355
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,356 473,036 kWh $0.05
Electricity Demand $16,695 2,783 kW-months/year $6.00
Electricity Fees $261 - $ -
LPG $24,684 5,301 MMBtu $4.66
Fuel Oil #2 $20,696 4,158 MMBtu $4.98
TOTAL ENERGY COSTS $95,192
RECOMMENDED SAVINGS* $5,481 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,580
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz) Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$286
Cost:
$3,907
$142 2,931 $144 24 - - - - - - $142
2,931
kWh
$144
24
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$700
Cost:
$1,252
$390 7,913 $310 52 - - - - - - $390
7,913
kWh
$310
52
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,131
Cost:
$800
- - - - $1,131 243 - - - - -
-
kWh
-
-
kW-months/year
$1,131
243
MMBtu
-
-
MMBtu
-
-
lb
04: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$190
Cost:
$603
- - - - - - $190 38 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$190
38
MMBtu
-
-
lb
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$228
Cost:
$137
- - - - - - $228 35 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$228
35
MMBtu
-
-
lb
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$169
Cost:
$379
- - - - - - $169 21 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$169
21
MMBtu
-
-
lb
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$901
Cost:
-
- - - - - - - - $901 594 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$901
594
lb
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,564
Cost:
-
- - - - - - $1,564 368 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,564
368
MMBtu
-
-
lb
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$312
Cost:
$150
$312 6,448 - - - - - - - - $312
6,448
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$5,481
Cost:
$7,228
$844 17,292 $454 76 $1,131 243 $2,151 462 $901 594 $844
17,292
kWh
$454
76
kW-months/year
$1,131
243
MMBtu
$2,151
462
MMBtu
$901
594
lb
TOTAL IMPLEMENTED Savings:
$4,580
Cost:
$7,228
$844 17,292 $454 76 $1,131 243 $2,151 462 - - $844
17,292
kWh
$454
76
kW-months/year
$1,131
243
MMBtu
$2,151
462
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb
Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz) Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz)