Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | South Dakota State |
---|---|
Assessment Year | 1996 |
Principal Product | Silos and Silo Unloaders |
NAICS | n/a |
SIC | 3272 - Concrete Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 93,843 |
Annual Production | 850 Pounds |
Production Hrs. Annual | 4,355 |
Location (State) | MN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $23,356 | 473,036 | kWh | $0.05 |
Electricity Demand | $16,695 | 2,783 | kW-months/year | $6.00 |
Electricity Fees | $261 | - | $ | - |
LPG | $24,684 | 5,301 | MMBtu | $4.66 |
Fuel Oil #2 | $20,696 | 4,158 | MMBtu | $4.98 |
TOTAL ENERGY COSTS | $95,192 | |||
RECOMMENDED SAVINGS* | $5,481 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,580 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $286 Cost: $3,907 |
$142 | 2,931 | $144 | 24 | - | - | - | - | - | - |
$142 2,931 kWh |
$144 24 kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $700 Cost: $1,252 |
$390 | 7,913 | $310 | 52 | - | - | - | - | - | - |
$390 7,913 kWh |
$310 52 kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,131 Cost: $800 |
- | - | - | - | $1,131 | 243 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,131 243 MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $190 Cost: $603 |
- | - | - | - | - | - | $190 | 38 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$190 38 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $228 Cost: $137 |
- | - | - | - | - | - | $228 | 35 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$228 35 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $169 Cost: $379 |
- | - | - | - | - | - | $169 | 21 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$169 21 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $901 Cost: - |
- | - | - | - | - | - | - | - | $901 | 594 |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$901 594 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,564 Cost: - |
- | - | - | - | - | - | $1,564 | 368 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,564 368 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $312 Cost: $150 |
$312 | 6,448 | - | - | - | - | - | - | - | - |
$312 6,448 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $5,481 Cost: $7,228 |
$844 | 17,292 | $454 | 76 | $1,131 | 243 | $2,151 | 462 | $901 | 594 | $844 17,292 kWh |
$454 76 kW-months/year |
$1,131 243 MMBtu |
$2,151 462 MMBtu |
$901 594 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,580 Cost: $7,228 |
$844 | 17,292 | $454 | 76 | $1,131 | 243 | $2,151 | 462 | - | - | $844 17,292 kWh |
$454 76 kW-months/year |
$1,131 243 MMBtu |
$2,151 462 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Solid Waste (non-haz) |