IAC logo
IAC Assessment: DS0069
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0069
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1996
Principal Product Grain Augers and Service Truck Bodies
NAICS n/a
SIC 3514 -
Sales $10,000,000-$50,000,000
# of Employees 124
Plant Area (Sq.Ft.) 33,980
Annual Production 15,500 Pieces
Production Hrs. Annual 2,860
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $26,678 859,027 kWh $0.03
Electricity Demand $29,590 3,912 kW-months/year $7.56
Electricity Fees $3,713 - $ -
Natural Gas $24,236 5,050 MMBtu $4.80
TOTAL ENERGY COSTS $85,021
RECOMMENDED SAVINGS* $18,829 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,223
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,691
Cost:
$4,761
$811 26,084 $880 120 - - - - $811
26,084
kWh
$880
120
kW-months/year
-
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$969
Cost:
-
$434 14,068 $535 72 - - - - $434
14,068
kWh
$535
72
kW-months/year
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$206
Cost:
$3,216
$84 2,638 $122 16 - - - - $84
2,638
kWh
$122
16
kW-months/year
-
-
$
-
-
$
04: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$6,240
Cost:
$100
- - - - $6,240 - - - -
-
kWh
-
-
kW-months/year
$6,240
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,323
Cost:
$600
$1,323 42,790 - - - - - - $1,323
42,790
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$8,400
Cost:
$6,720
- - - - - - $8,400 - -
-
kWh
-
-
kW-months/year
-
-
$
$8,400
-
$
TOTAL RECOMMENDED Savings:
$18,829
Cost:
$15,397
$2,652 85,580 $1,537 208 $6,240 - $8,400 - $2,652
85,580
kWh
$1,537
208
kW-months/year
$6,240
-
$
$8,400
-
$
TOTAL IMPLEMENTED Savings:
$10,223
Cost:
$5,461
$2,568 82,942 $1,415 192 $6,240 - - - $2,568
82,942
kWh
$1,415
192
kW-months/year
$6,240
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost