IAC logo
IAC Assessment: DS0074
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0074
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1996
Principal Product Industrial Ovens and Furnaces
NAICS n/a
SIC 3156 -
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 148,800
Annual Production 208 Pieces
Production Hrs. Annual 4,160
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,658 3,925,557 kWh $0.03
Electricity Demand $78,976 10,548 kW-months/year $7.49
Electricity Fees $7,342 - $ -
Natural Gas $92,177 42,104 MMBtu $2.19
TOTAL ENERGY COSTS $371,429
RECOMMENDED SAVINGS* $75,068 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $75,068
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,466
Cost:
$14,848
$7,794 236,225 $5,672 751 - - - - - - $7,794
236,225
kWh
$5,672
751
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$168
Cost:
$1,484
$96 2,931 $72 10 - - - - - - $96
2,931
kWh
$72
10
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
03: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$57,080
Cost:
$6,500
- - - - - - $55,120 1,378 $1,960 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$55,120
1,378
gal
$1,960
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$336
Cost:
$240
$336 10,258 - - - - - - - - $336
10,258
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,018
Cost:
$2,250
- - - - $4,018 1,028 - - - - -
-
kWh
-
-
kW-months/year
$4,018
1,028
MMBtu
-
-
gal
-
-
lb
TOTAL RECOMMENDED Savings:
$75,068
Cost:
$25,322
$8,226 249,414 $5,744 761 $4,018 1,028 $55,120 1,378 $1,960 - $8,226
249,414
kWh
$5,744
761
kW-months/year
$4,018
1,028
MMBtu
$55,120
1,378
gal
$1,960
-
lb
TOTAL IMPLEMENTED Savings:
$75,068
Cost:
$25,322
$8,226 249,414 $5,744 761 $4,018 1,028 $55,120 1,378 $1,960 - $8,226
249,414
kWh
$5,744
761
kW-months/year
$4,018
1,028
MMBtu
$55,120
1,378
gal
$1,960
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz)