Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | South Dakota State |
---|---|
Assessment Year | 1996 |
Principal Product | Industrial Ovens and Furnaces |
NAICS | n/a |
SIC | 3156 - |
Sales | $10,000,000-$50,000,000 |
# of Employees | 220 |
Plant Area (Sq.Ft.) | 148,800 |
Annual Production | 208 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | MN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $121,658 | 3,925,557 | kWh | $0.03 |
Electricity Demand | $78,976 | 10,548 | kW-months/year | $7.49 |
Electricity Fees | $7,342 | - | $ | - |
Natural Gas | $92,177 | 42,104 | MMBtu | $2.19 |
TOTAL ENERGY COSTS | $371,429 | |||
RECOMMENDED SAVINGS* | $75,068 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $75,068 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,466 Cost: $14,848 |
$7,794 | 236,225 | $5,672 | 751 | - | - | - | - | - | - |
$7,794 236,225 kWh |
$5,672 751 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $168 Cost: $1,484 |
$96 | 2,931 | $72 | 10 | - | - | - | - | - | - |
$96 2,931 kWh |
$72 10 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $57,080 Cost: $6,500 |
- | - | - | - | - | - | $55,120 | 1,378 | $1,960 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$55,120 1,378 gal |
$1,960 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $336 Cost: $240 |
$336 | 10,258 | - | - | - | - | - | - | - | - |
$336 10,258 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $4,018 Cost: $2,250 |
- | - | - | - | $4,018 | 1,028 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,018 1,028 MMBtu |
- - gal |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $75,068 Cost: $25,322 |
$8,226 | 249,414 | $5,744 | 761 | $4,018 | 1,028 | $55,120 | 1,378 | $1,960 | - | $8,226 249,414 kWh |
$5,744 761 kW-months/year |
$4,018 1,028 MMBtu |
$55,120 1,378 gal |
$1,960 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $75,068 Cost: $25,322 |
$8,226 | 249,414 | $5,744 | 761 | $4,018 | 1,028 | $55,120 | 1,378 | $1,960 | - | $8,226 249,414 kWh |
$5,744 761 kW-months/year |
$4,018 1,028 MMBtu |
$55,120 1,378 gal |
$1,960 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) |