IAC Assessment: DS0108
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0108
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1998
Principal Product Sprayers and Spray Assemblies
NAICS n/a
SIC 3523 - Farm Machinery And Equipment
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 103,540
Annual Production 1,000 Pieces
Production Hrs. Annual 2,080
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,350 412,661 kWh $0.07
Electricity Demand $32,457 2,280 kW-months/year $14.24
Electricity Fees $540 - $ -
Natural Gas $25,199 4,731 MMBtu $5.33
TOTAL ENERGY COSTS $90,661
RECOMMENDED SAVINGS* $36,994 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,894
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,821
Cost:
$15,624
$4,236 57,151 $3,585 252 - - - - - - $4,236
57,151
kWh
$3,585
252
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$323
Cost:
$230
$323 4,396 - - - - - - - - $323
4,396
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,721
Cost:
$140
$1,107 14,947 $614 43 - - - - - - $1,107
14,947
kWh
$614
43
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$4,634
Cost:
$3,465
- - - - $4,634 916 - - - - -
-
kWh
-
-
kW-months/year
$4,634
916
MMBtu
-
-
lb
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,100
Cost:
$4,750
- - - - - - $1,100 11,400 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,100
11,400
lb
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$595
Cost:
$400
- - - - - - $595 15,200 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$595
15,200
lb
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$20,800
Cost:
$500
- - - - - - - - $20,800 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$20,800
-
$
TOTAL RECOMMENDED Savings:
$36,994
Cost:
$25,109
$5,666 76,494 $4,199 295 $4,634 916 $1,695 26,600 $20,800 - $5,666
76,494
kWh
$4,199
295
kW-months/year
$4,634
916
MMBtu
$1,695
26,600
lb
$20,800
-
$
TOTAL IMPLEMENTED Savings:
$35,894
Cost:
$20,359
$5,666 76,494 $4,199 295 $4,634 916 $595 15,200 $20,800 - $5,666
76,494
kWh
$4,199
295
kW-months/year
$4,634
916
MMBtu
$595
15,200
lb
$20,800
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes