Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | South Dakota State |
---|---|
Assessment Year | 1998 |
Principal Product | Sprayers and Spray Assemblies |
NAICS | n/a |
SIC | 3523 - Farm Machinery And Equipment |
Sales | $1,000,000-$5,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 103,540 |
Annual Production | 1,000 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $30,350 | 412,661 | kWh | $0.07 |
Electricity Demand | $32,457 | 2,280 | kW-months/year | $14.24 |
Electricity Fees | $540 | - | $ | - |
Natural Gas | $25,199 | 4,731 | MMBtu | $5.33 |
TOTAL ENERGY COSTS | $90,661 | |||
RECOMMENDED SAVINGS* | $36,994 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $35,894 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,821 Cost: $15,624 |
$4,236 | 57,151 | $3,585 | 252 | - | - | - | - | - | - |
$4,236 57,151 kWh |
$3,585 252 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $323 Cost: $230 |
$323 | 4,396 | - | - | - | - | - | - | - | - |
$323 4,396 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,721 Cost: $140 |
$1,107 | 14,947 | $614 | 43 | - | - | - | - | - | - |
$1,107 14,947 kWh |
$614 43 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $4,634 Cost: $3,465 |
- | - | - | - | $4,634 | 916 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,634 916 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $1,100 Cost: $4,750 |
- | - | - | - | - | - | $1,100 | 11,400 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,100 11,400 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $595 Cost: $400 |
- | - | - | - | - | - | $595 | 15,200 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$595 15,200 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $20,800 Cost: $500 |
- | - | - | - | - | - | - | - | $20,800 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$20,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $36,994 Cost: $25,109 |
$5,666 | 76,494 | $4,199 | 295 | $4,634 | 916 | $1,695 | 26,600 | $20,800 | - | $5,666 76,494 kWh |
$4,199 295 kW-months/year |
$4,634 916 MMBtu |
$1,695 26,600 lb |
$20,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $35,894 Cost: $20,359 |
$5,666 | 76,494 | $4,199 | 295 | $4,634 | 916 | $595 | 15,200 | $20,800 | - | $5,666 76,494 kWh |
$4,199 295 kW-months/year |
$4,634 916 MMBtu |
$595 15,200 lb |
$20,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes |