IAC logo
IAC Assessment: DS0110
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0110
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1998
Principal Product Steel Pedestrian Bridges and Grain Bin Hoppers
NAICS n/a
SIC 3440 -
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 69,000
Annual Production 600 Pieces
Production Hrs. Annual 2,444
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $28,679 804,807 kWh $0.04
Electricity Demand $32,784 4,680 kW-months/year $7.01
LPG $23,535 3,637 MMBtu $6.47
Fuel Oil #2 $5,583 834 MMBtu $6.69
TOTAL ENERGY COSTS $93,495
RECOMMENDED SAVINGS* $150,979 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,918
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand LPG Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,901
Cost:
$3,030
$880 24,326 $840 120 - - - - - - $181 - - - - - $880
24,326
kWh
$840
120
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$181
-
$
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$747
Cost:
$763
- - - - $747 242 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$747
242
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$791
Cost:
$1,595
- - - - $791 226 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$791
226
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$960
Cost:
$4,750
- - $(-59) (-8) - - - - $648 13,200 $(-157) - $528 - - - -
-
kWh
$(-59)
(-8)
kW-months/year
-
-
MMBtu
-
-
gal
$648
13,200
lb
$(-157)
-
$
$528
-
$
-
-
$
05: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$136,736
Cost:
$12,000
- - - - - - - - - - $11,558 - - - $125,178 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$11,558
-
$
-
-
$
$125,178
-
$
06: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$2,574
Cost:
$12,130
- - - - - - - - - - $1,866 - - - $708 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$1,866
-
$
-
-
$
$708
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$7,270
Cost:
$1,200
- - - - - - $7,270 784 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,270
784
gal
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$150,979
Cost:
$35,468
$880 24,326 $781 112 $1,538 468 $7,270 784 $648 13,200 $13,448 - $528 - $125,886 - $880
24,326
kWh
$781
112
kW-months/year
$1,538
468
MMBtu
$7,270
784
gal
$648
13,200
lb
$13,448
-
$
$528
-
$
$125,886
-
$
TOTAL IMPLEMENTED Savings:
$9,918
Cost:
$4,993
$880 24,326 $840 120 $747 242 $7,270 784 - - $181 - - - - - $880
24,326
kWh
$840
120
kW-months/year
$747
242
MMBtu
$7,270
784
gal
-
-
lb
$181
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand LPG Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand LPG Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material