IAC Assessment: DS0112
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0112
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1998
Principal Product Corrugated containers
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 157
Plant Area (Sq.Ft.) 138,400
Annual Production 7,200,000 Thousand Feet
Production Hrs. Annual 7,488
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,935 4,606,389 kWh $0.03
Electricity Demand $76,079 9,948 kW-months/year $7.65
Electricity Fees $12,973 - $ -
Natural Gas $144,753 104,954 MMBtu $1.38
Fuel Oil #2 $15,952 2,980 MMBtu $5.35
TOTAL ENERGY COSTS $(-278,308)
RECOMMENDED SAVINGS* $22,088 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,725
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,447
Cost:
$21,490
$3,868 128,957 $1,579 206 - - - - - - $3,868
128,957
kWh
$1,579
206
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$3,019
Cost:
$1,375
- - $3,019 395 - - - - - - -
-
kWh
$3,019
395
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,228
Cost:
$12,710
$(-1,651) (-55,100) $(-652) (-85) $14,531 9,818 - - - - $(-1,651)
(-55,100)
kWh
$(-652)
(-85)
kW-months/year
$14,531
9,818
MMBtu
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$775
Cost:
$680
- - - - $775 524 - - - - -
-
kWh
-
-
kW-months/year
$775
524
MMBtu
-
-
$
-
-
$
05: 3.7121 IMPROVE HANDLING PRACTICES Savings:
$360
Cost:
$352
- - - - - - - - $360 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$360
-
$
06: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$259
Cost:
-
- - - - - - $259 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$259
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$22,088
Cost:
$36,607
$2,217 73,857 $3,946 516 $15,306 10,342 $259 - $360 - $2,217
73,857
kWh
$3,946
516
kW-months/year
$15,306
10,342
MMBtu
$259
-
$
$360
-
$
TOTAL IMPLEMENTED Savings:
$8,725
Cost:
$22,865
$3,868 128,957 $4,598 601 - - $259 - - - $3,868
128,957
kWh
$4,598
601
kW-months/year
-
-
MMBtu
$259
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material