Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1998
Principal Product Fluid Milk, Cream, and Juice
NAICS n/a
SIC 2026 - Fluid Milk
Sales $50,000,000-$100,000,000
# of Employees 85
Plant Area (Sq.Ft.) 35,000
Annual Production 19,760 Thousand Gallons
Production Hrs. Annual 4,992
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,889 3,923,798 kWh $0.04
Electricity Demand $32,546 9,468 kW-months/year $3.44
Electricity Fees $11,026 - $ -
Natural Gas $55,000 12,791 MMBtu $4.30
TOTAL ENERGY COSTS $289,201
RECOMMENDED SAVINGS* $24,474 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,935
Cost:
$14,709
$4,295 113,130 $640 186 - - - - - - - - $4,295
113,130
kWh
$640
186
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$827
Cost:
$598
$186 4,982 - - $641 149 - - - - - - $186
4,982
kWh
-
-
kW-months/year
$641
149
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$16,899
Cost:
$444
$(-3,122) (-82,063) $(-227) (-66) - - $11,449 5,724,576 - - $8,799 - $(-3,122)
(-82,063)
kWh
$(-227)
(-66)
kW-months/year
-
-
MMBtu
$11,449
5,724,576
Tgal
-
-
$
$8,799
-
Tgal
04: 3.4151 MINIMIZE WATER USAGE Savings:
$322
Cost:
$448
- - - - - - - - - - $322 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$322
-
Tgal
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,147
Cost:
$280
- - - - - - - - $1,147 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,147
-
$
-
-
Tgal
06: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$344
Cost:
-
- - - - - - - - $344 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$344
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$24,474
Cost:
$16,479
$1,359 36,049 $413 120 $641 149 $11,449 5,724,576 $1,491 - $9,121 - $1,359
36,049
kWh
$413
120
kW-months/year
$641
149
MMBtu
$11,449
5,724,576
Tgal
$1,491
-
$
$9,121
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption