IAC logo
IAC Assessment: DS0122
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1998
Principal Product Signing
NAICS n/a
SIC 3993 - Signs And Advertising Specialities
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 70,606
Annual Production 2,000,000 Pieces
Production Hrs. Annual 5,200
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,527 911,489 kWh $0.04
Electricity Demand $15,294 3,433 kW-months/year $4.45
Electricity Fees $306 - $ -
Natural Gas $34,506 8,150 MMBtu $4.23
TOTAL ENERGY COSTS $90,357
RECOMMENDED SAVINGS* $118,746 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,650
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,240
Cost:
$11,085
$2,491 63,892 $749 168 - - - - $2,491
63,892
kWh
$749
168
kW-months/year
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$398
Cost:
$250
$315 8,206 $83 19 - - - - $315
8,206
kWh
$83
19
kW-months/year
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,446
Cost:
$72
$1,144 29,308 $302 68 - - - - $1,144
29,308
kWh
$302
68
kW-months/year
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$373
Cost:
$26
$295 7,620 $78 17 - - - - $295
7,620
kWh
$78
17
kW-months/year
-
-
$
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$433
Cost:
$88
$433 14,068 - - - - - - $433
14,068
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,118
Cost:
$4,750
- - - - - - $1,118 - -
-
kWh
-
-
kW-months/year
-
-
$
$1,118
-
$
07: 3.2176 INCREASE USE OF AUTOMATION Savings:
$91,520
Cost:
$15,000
- - - - $91,520 - - - -
-
kWh
-
-
kW-months/year
$91,520
-
$
-
-
$
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$20,218
Cost:
$77,000
- - - - $20,218 - - - -
-
kWh
-
-
kW-months/year
$20,218
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$118,746
Cost:
$108,271
$4,678 123,094 $1,212 272 $111,738 - $1,118 - $4,678
123,094
kWh
$1,212
272
kW-months/year
$111,738
-
$
$1,118
-
$
TOTAL IMPLEMENTED Savings:
$2,650
Cost:
$436
$2,187 59,202 $463 104 - - - - $2,187
59,202
kWh
$463
104
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes