IAC logo
IAC Assessment: GT0147
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0147
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1982
Principal Product CARPET YARN
NAICS n/a
SIC 2281 - Yarn Spinning Mills
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 0
Annual Production 5,000 Tons
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $442,870 10,695,194 kWh $0.04
Natural Gas $210,522 52,323 MMBtu $4.02
Fuel Oil #2 $1,904 232 MMBtu $8.21
TOTAL ENERGY COSTS $655,296
RECOMMENDED SAVINGS* $84,421 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,413
Cost:
-
- - $5,364 1,373 $49 6 -
-
kWh
$5,364
1,373
MMBtu
$49
6
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,043
Cost:
$5,699
$4,043 97,597 - - - - $4,043
97,597
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$714
Cost:
$1,500
$714 17,292 - - - - $714
17,292
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$7,304
Cost:
$12,000
$7,304 287,222 - - - - $7,304
287,222
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$65,481
Cost:
$276,904
$65,481 1,581,770 - - - - $65,481
1,581,770
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$1,466
Cost:
$1,200
- - $1,466 375 - - -
-
kWh
$1,466
375
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$84,421
Cost:
$297,303
$77,542 1,983,881 $6,830 1,748 $49 6 $77,542
1,983,881
kWh
$6,830
1,748
MMBtu
$49
6
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2