IAC logo
IAC Assessment: GT0173
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0173
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1983
Principal Product WOVEN FABRIC
NAICS n/a
SIC 2211 - Broadwoven Fabric Mills, Cotton
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 6,250,000 Pounds
Production Hrs. Annual 7,200
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $465,779 10,174,092 kWh $0.05
Natural Gas $68,269 15,029 MMBtu $4.54
Fuel Oil #2 $8,041 1,074 MMBtu $7.49
TOTAL ENERGY COSTS $542,089
RECOMMENDED SAVINGS* $63,439 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,420
Cost:
$50
- - $1,420 320 -
-
kWh
$1,420
320
MMBtu
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$7,234
Cost:
$9,000
$7,234 - - - $7,234
-
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$41,600
Cost:
$143,600
$41,600 908,558 - - $41,600
908,558
kWh
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,200
Cost:
$1,000
$2,200 48,652 - - $2,200
48,652
kWh
-
-
MMBtu
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,455
Cost:
$120
- - $1,455 330 -
-
kWh
$1,455
330
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,530
Cost:
$600
$9,530 208,382 - - $9,530
208,382
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$63,439
Cost:
$154,370
$60,564 1,165,592 $2,875 650 $60,564
1,165,592
kWh
$2,875
650
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas