IAC logo
IAC Assessment: GT0200
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0200
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1983
Principal Product FINISHED FABRIC
NAICS n/a
SIC 2231 - Broadwoven Fabric Mills, Wool
Sales $50,000,000-$100,000,000
# of Employees 252
Plant Area (Sq.Ft.) 0
Annual Production 17,400 Thousand Feet
Production Hrs. Annual 7,200
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $367,869 8,049,531 kWh $0.05
Natural Gas $1,146,886 247,823 MMBtu $4.63
Fuel Oil #6 $17,699 3,612 MMBtu $4.90
TOTAL ENERGY COSTS $1,532,454
RECOMMENDED SAVINGS* $531,511 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$373,500
Cost:
$220,000
- - $373,500 83,000 -
-
kWh
$373,500
83,000
MMBtu
02: 2.5191 MODIFY DYE BECK Savings:
$36,666
Cost:
$41,000
- - $36,666 8,148 -
-
kWh
$36,666
8,148
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$33,660
Cost:
$30,000
- - $33,660 7,480 -
-
kWh
$33,660
7,480
MMBtu
04: 2.5192 MODIFY TEXTILE DRYERS Savings:
$46,800
Cost:
$55,000
- - $46,800 10,400 -
-
kWh
$46,800
10,400
MMBtu
05: 2.2422 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM Savings:
$9,885
Cost:
$15,000
- - $9,885 2,196 -
-
kWh
$9,885
2,196
MMBtu
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$31,000
Cost:
$22,000
$31,000 - - - $31,000
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$531,511
Cost:
$383,000
$31,000 - $500,511 111,224 $31,000
-
kWh
$500,511
111,224
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas