IAC logo
IAC Assessment: GT0225
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0225
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1984
Principal Product YARNS & TWINES
NAICS n/a
SIC 2281 - Yarn Spinning Mills
Sales $10,000,000-$50,000,000
# of Employees 215
Plant Area (Sq.Ft.) 0
Annual Production 6,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $238,073 4,711,899 kWh $0.05
Natural Gas $17,992 3,100 MMBtu $5.80
TOTAL ENERGY COSTS $256,065
RECOMMENDED SAVINGS* $22,243 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,523
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$12,518
Cost:
$12,000
$12,518 - - - $12,518
-
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,575
Cost:
$2,442
$2,575 50,996 - - $2,575
50,996
kWh
-
-
MMBtu
03: 2.2711 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING Savings:
$1,720
Cost:
$4,000
$1,720 69,754 - - $1,720
69,754
kWh
-
-
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$730
Cost:
$1,500
- - $730 130 -
-
kWh
$730
130
MMBtu
05: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$4,700
Cost:
$18,800
$4,082 81,770 $618 111 $4,082
81,770
kWh
$618
111
MMBtu
TOTAL RECOMMENDED Savings:
$22,243
Cost:
$38,742
$20,895 202,520 $1,348 241 $20,895
202,520
kWh
$1,348
241
MMBtu
TOTAL IMPLEMENTED Savings:
$20,523
Cost:
$34,742
$19,175 132,766 $1,348 241 $19,175
132,766
kWh
$1,348
241
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas