IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1985
Principal Product REFRACTORY CLAY
NAICS n/a
SIC 3255 - Clay Refractories
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 0
Annual Production 125,000 Tons
Production Hrs. Annual 2,040
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,543 553,048 kWh $0.12
Natural Gas $76,452 15,340 MMBtu $4.98
TOTAL ENERGY COSTS $141,995
RECOMMENDED SAVINGS* $32,133 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,559
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$329
Cost:
$330
$329 2,931 - - $329
2,931
kWh
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$195
Cost:
$75
$195 1,758 - - $195
1,758
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$970
Cost:
$500
$970 8,206 - - $970
8,206
kWh
-
-
MMBtu
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$709
Cost:
-
$709 5,862 - - $709
5,862
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,330
Cost:
$640
$1,330 11,137 - - $1,330
11,137
kWh
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$11,900
Cost:
$9,650
- - $11,900 2,460 -
-
kWh
$11,900
2,460
MMBtu
07: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$16,700
Cost:
$1,000
- - $16,700 3,450 -
-
kWh
$16,700
3,450
MMBtu
TOTAL RECOMMENDED Savings:
$32,133
Cost:
$12,195
$3,533 29,894 $28,600 5,910 $3,533
29,894
kWh
$28,600
5,910
MMBtu
TOTAL IMPLEMENTED Savings:
$13,559
Cost:
$10,620
$1,659 14,068 $11,900 2,460 $1,659
14,068
kWh
$11,900
2,460
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas