IAC logo
IAC Assessment: GT0350
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0350
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1988
Principal Product BASE CHEMICALS
NAICS n/a
SIC 2843 - Surface Active Agents
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 0
Annual Production 21,800,000 Pounds
Production Hrs. Annual 4,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,473 1,626,026 kWh $0.07
Natural Gas $90,447 25,281 MMBtu $3.58
TOTAL ENERGY COSTS $198,920
RECOMMENDED SAVINGS* $30,417 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,807
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.5194 REDESIGN PROCESS Savings:
$20,803
Cost:
$89,500
- - $803 232 $20,000 - -
-
kWh
$803
232
MMBtu
$20,000
-
$
02: 2.2514 COVER OPEN TANKS Savings:
$610
Cost:
$2,280
- - $610 169 - - -
-
kWh
$610
169
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,140
Cost:
$1,730
- - $2,140 600 - - -
-
kWh
$2,140
600
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,300
Cost:
$9,000
- - $4,300 1,204 - - -
-
kWh
$4,300
1,204
MMBtu
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$280
Cost:
$100
- - $280 79 - - -
-
kWh
$280
79
MMBtu
-
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,090
Cost:
-
$1,090 16,120 - - - - $1,090
16,120
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,194
Cost:
$1,680
$1,194 17,878 - - - - $1,194
17,878
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$30,417
Cost:
$104,290
$2,284 33,998 $8,133 2,284 $20,000 - $2,284
33,998
kWh
$8,133
2,284
MMBtu
$20,000
-
$
TOTAL IMPLEMENTED Savings:
$29,807
Cost:
$102,010
$2,284 33,998 $7,523 2,115 $20,000 - $2,284
33,998
kWh
$7,523
2,115
MMBtu
$20,000
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes