IAC logo
IAC Assessment: GT0388
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0388
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1989
Principal Product LUMBER AND PLYWOOD
NAICS n/a
SIC 2491 - Wood Preserving
Sales $50,000,000-$100,000,000
# of Employees 70
Plant Area (Sq.Ft.) 0
Annual Production 51,000 Thousand Feet
Production Hrs. Annual 4,160
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,917 602,872 kWh $0.07
Natural Gas $94,979 28,002 MMBtu $3.39
Fuel Oil #2 $12,009 2,808 MMBtu $4.28
TOTAL ENERGY COSTS $147,905
RECOMMENDED SAVINGS* $9,819 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,119
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,330
Cost:
$3,000
$3,330 - - - $3,330
-
kWh
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,300
Cost:
$10,000
$5,300 76,202 - - $5,300
76,202
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$278
Cost:
$230
$278 4,103 - - $278
4,103
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$626
Cost:
-
$626 8,206 - - $626
8,206
kWh
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$190
Cost:
$410
- - $190 56 -
-
kWh
$190
56
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25
Cost:
$15
$25 293 - - $25
293
kWh
-
-
MMBtu
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$70
Cost:
$45
- - $70 20 -
-
kWh
$70
20
MMBtu
TOTAL RECOMMENDED Savings:
$9,819
Cost:
$13,700
$9,559 88,804 $260 76 $9,559
88,804
kWh
$260
76
MMBtu
TOTAL IMPLEMENTED Savings:
$1,119
Cost:
$655
$929 12,602 $190 56 $929
12,602
kWh
$190
56
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas