IAC logo
IAC Assessment: GT0391
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0391
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1989
Principal Product ANIMAL FEEDS
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $50,000,000-$100,000,000
# of Employees 53
Plant Area (Sq.Ft.) 0
Annual Production 395,000 Tons
Production Hrs. Annual 6,000
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $358,744 5,905,920 kWh $0.06
Natural Gas $143,478 46,834 MMBtu $3.06
TOTAL ENERGY COSTS $502,222
RECOMMENDED SAVINGS* $10,394 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,226
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,039
Cost:
-
- - $1,639 552 $(-600) - -
-
kWh
$1,639
552
MMBtu
$(-600)
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,002
Cost:
$1,505
$2,002 33,118 - - - - $2,002
33,118
kWh
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$468
Cost:
-
$468 7,620 - - - - $468
7,620
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,168
Cost:
$1,614
$6,168 101,700 - - - - $6,168
101,700
kWh
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$540
Cost:
$1,000
$540 8,792 - - - - $540
8,792
kWh
-
-
MMBtu
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$177
Cost:
$456
- - $177 60 - - -
-
kWh
$177
60
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$10,394
Cost:
$4,575
$9,178 151,230 $1,816 612 $(-600) - $9,178
151,230
kWh
$1,816
612
MMBtu
$(-600)
-
$
TOTAL IMPLEMENTED Savings:
$4,226
Cost:
$2,961
$3,010 49,530 $1,816 612 $(-600) - $3,010
49,530
kWh
$1,816
612
MMBtu
$(-600)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes