IAC logo
IAC Assessment: GT0393
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0393
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1989
Principal Product TUFTED CARPET
NAICS n/a
SIC 2273 - Carpets And Rugs
Sales $1,000,000-$5,000,000
# of Employees 616
Plant Area (Sq.Ft.) 0
Annual Production 25,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $721,333 13,640,094 kWh $0.05
Natural Gas $185,465 54,786 MMBtu $3.39
TOTAL ENERGY COSTS $906,798
RECOMMENDED SAVINGS* $36,040 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,653
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,350
Cost:
$2,699
$20,350 384,525 - - - - $20,350
384,525
kWh
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$957
Cost:
$790
$957 18,171 - - - - $957
18,171
kWh
-
-
MMBtu
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,113
Cost:
-
$2,113 39,859 - - - - $2,113
39,859
kWh
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$904
Cost:
$10,000
- - $904 263 - - -
-
kWh
$904
263
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$739
Cost:
-
- - $1,039 310 $(-300) - -
-
kWh
$1,039
310
MMBtu
$(-300)
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$550
Cost:
$534
- - $550 162 - - -
-
kWh
$550
162
MMBtu
-
-
$
07: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$933
Cost:
-
- - $933 271 - - -
-
kWh
$933
271
MMBtu
-
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,494
Cost:
$3,000
- - $9,494 2,760 - - -
-
kWh
$9,494
2,760
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$36,040
Cost:
$17,023
$23,420 442,555 $12,920 3,766 $(-300) - $23,420
442,555
kWh
$12,920
3,766
MMBtu
$(-300)
-
$
TOTAL IMPLEMENTED Savings:
$33,653
Cost:
$6,489
$23,420 442,555 $10,533 3,070 $(-300) - $23,420
442,555
kWh
$10,533
3,070
MMBtu
$(-300)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes