IAC Assessment: GT0397
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0397
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1990
Principal Product PRECOOKED MEAT & POULTRY
NAICS n/a
SIC 2015 - Poultry Slaughtering And Processing
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 0
Annual Production 35,000,000 Pounds
Production Hrs. Annual 6,600
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $547,405 10,182,884 kWh $0.05
Natural Gas $252,837 88,561 MMBtu $2.85
TOTAL ENERGY COSTS $800,242
RECOMMENDED SAVINGS* $26,562 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$409
Cost:
-
$409 7,620 - - $409
7,620
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,478
Cost:
$16,729
$7,478 138,921 - - $7,478
138,921
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$816
Cost:
$2,103
$816 15,240 - - $816
15,240
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$569
Cost:
-
$569 10,551 - - $569
10,551
kWh
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$390
Cost:
$224
- - $390 137 -
-
kWh
$390
137
MMBtu
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,300
Cost:
$300
- - $2,300 807 -
-
kWh
$2,300
807
MMBtu
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,690
Cost:
$450
- - $1,690 593 -
-
kWh
$1,690
593
MMBtu
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$12,910
Cost:
$15,000
- - $12,910 4,530 -
-
kWh
$12,910
4,530
MMBtu
TOTAL RECOMMENDED Savings:
$26,562
Cost:
$34,806
$9,272 172,332 $17,290 6,067 $9,272
172,332
kWh
$17,290
6,067
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas