IAC logo
IAC Assessment: GT0398
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0398
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1990
Principal Product FROZEN MEATS
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 375
Plant Area (Sq.Ft.) 0
Annual Production 35,000,000 Pounds
Production Hrs. Annual 4,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $791,594 15,856,976 kWh $0.05
Natural Gas $230,993 77,992 MMBtu $2.96
LPG $7,555 2,382 MMBtu $3.17
TOTAL ENERGY COSTS $1,030,142
RECOMMENDED SAVINGS* $67,813 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$817
Cost:
$400
$817 16,413 - - $817
16,413
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,130
Cost:
$14,910
$5,130 102,872 - - $5,130
102,872
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,472
Cost:
$3,777
$4,472 89,683 - - $4,472
89,683
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$634
Cost:
-
$634 12,603 - - $634
12,603
kWh
-
-
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$10,294
Cost:
$15,320
- - $10,294 3,466 -
-
kWh
$10,294
3,466
MMBtu
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,275
Cost:
$2,843
- - $1,275 429 -
-
kWh
$1,275
429
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$201
Cost:
-
$201 4,103 - - $201
4,103
kWh
-
-
MMBtu
08: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$340
Cost:
$200
- - $340 116 -
-
kWh
$340
116
MMBtu
09: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$25,600
Cost:
$1,500
- - $25,600 8,620 -
-
kWh
$25,600
8,620
MMBtu
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$19,050
Cost:
$76,500
- - $19,050 6,410 -
-
kWh
$19,050
6,410
MMBtu
TOTAL RECOMMENDED Savings:
$67,813
Cost:
$115,450
$11,254 225,674 $56,559 19,041 $11,254
225,674
kWh
$56,559
19,041
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu