IAC logo
IAC Assessment: GT0403
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0403
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1990
Principal Product ADHESIVES & SOLID WASTES
NAICS n/a
SIC 2899 - Chemical Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 3,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $165,346 2,565,065 kWh $0.06
Natural Gas $96,851 17,818 MMBtu $5.44
TOTAL ENERGY COSTS $262,197
RECOMMENDED SAVINGS* $30,671 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,705
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$921
Cost:
$277
$921 14,361 - - $921
14,361
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,276
Cost:
-
$1,276 19,637 - - $1,276
19,637
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,588
Cost:
$4,065
$1,588 24,619 - - $1,588
24,619
kWh
-
-
MMBtu
04: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$1,160
Cost:
$1,000
- - $1,160 340 -
-
kWh
$1,160
340
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,610
Cost:
$9,150
- - $5,610 1,650 -
-
kWh
$5,610
1,650
MMBtu
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$5,760
Cost:
$275
- - $5,760 1,700 -
-
kWh
$5,760
1,700
MMBtu
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$7,876
Cost:
$5,715
- - $7,876 2,316 -
-
kWh
$7,876
2,316
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,730
Cost:
-
$5,730 87,925 - - $5,730
87,925
kWh
-
-
MMBtu
09: 2.6232 INSTALL SET-BACK TIMERS Savings:
$750
Cost:
$300
$750 11,723 - - $750
11,723
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$30,671
Cost:
$20,782
$10,265 158,265 $20,406 6,006 $10,265
158,265
kWh
$20,406
6,006
MMBtu
TOTAL IMPLEMENTED Savings:
$10,705
Cost:
$5,617
$3,785 58,617 $6,920 2,040 $3,785
58,617
kWh
$6,920
2,040
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas