IAC logo
IAC Assessment: GT0411
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0411
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1990
Principal Product STAINLESS STEEL FRAMES
NAICS n/a
SIC 3356 - Nonferrous Rolling And Drawing, Nec
Sales $5,000,000-$10,000,000
# of Employees 90
Plant Area (Sq.Ft.) 0
Annual Production 980,000 Pieces
Production Hrs. Annual 2,805
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,431 461,899 kWh $0.08
Natural Gas $5,624 795 MMBtu $7.07
TOTAL ENERGY COSTS $43,055
RECOMMENDED SAVINGS* $6,159 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,520
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,510
Cost:
-
$3,510 43,376 $3,510
43,376
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$393
Cost:
$48
$393 4,982 $393
4,982
kWh
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$914
Cost:
-
$914 11,137 $914
11,137
kWh
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$533
Cost:
$678
$533 6,448 $533
6,448
kWh
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$639
Cost:
-
$639 7,913 $639
7,913
kWh
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$170
Cost:
$450
$170 2,052 $170
2,052
kWh
TOTAL RECOMMENDED Savings:
$6,159
Cost:
$1,176
$6,159 75,908 $6,159
75,908
kWh
TOTAL IMPLEMENTED Savings:
$5,520
Cost:
$1,176
$5,520 67,995 $5,520
67,995
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage