IAC logo
IAC Assessment: GT0421
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0421
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1990
Principal Product WOOD MOLDING
NAICS n/a
SIC 2431 - Millwork
Sales $5,000,000-$10,000,000
# of Employees 65
Plant Area (Sq.Ft.) 0
Annual Production 40,000 Thousand Feet
Production Hrs. Annual 2,000
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,149 753,517 kWh $0.07
TOTAL ENERGY COSTS $51,149
RECOMMENDED SAVINGS* $8,089 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,363
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$61
Cost:
$38
$61 879 $61
879
kWh
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$129
Cost:
$155
$129 2,052 $129
2,052
kWh
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$482
Cost:
$954
$482 7,034 $482
7,034
kWh
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$657
Cost:
-
$657 9,672 $657
9,672
kWh
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,940
Cost:
$3,250
$4,940 72,685 $4,940
72,685
kWh
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,820
Cost:
$500
$1,820 26,671 $1,820
26,671
kWh
TOTAL RECOMMENDED Savings:
$8,089
Cost:
$4,897
$8,089 118,993 $8,089
118,993
kWh
TOTAL IMPLEMENTED Savings:
$2,363
Cost:
$1,492
$2,363 34,584 $2,363
34,584
kWh
Savings
Cost
$ kWh