IAC logo
IAC Assessment: GT0433
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0433
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1991
Principal Product COTTON HOSIERY
NAICS n/a
SIC 2252 - Hosiery, Nec
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 0
Annual Production 3,000,000 Pieces
Production Hrs. Annual 4,500
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $213,128 2,517,292 kWh $0.08
Natural Gas $170,171 32,618 MMBtu $5.22
TOTAL ENERGY COSTS $383,299
RECOMMENDED SAVINGS* $44,663 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,663
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,535
Cost:
$1,000
$5,535 65,358 - - $5,535
65,358
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$553
Cost:
$2,462
$553 6,448 - - $553
6,448
kWh
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$225
Cost:
$800
$225 2,638 - - $225
2,638
kWh
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,810
Cost:
$1,000
$1,810 21,395 - - $1,810
21,395
kWh
-
-
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,900
Cost:
$500
$1,900 22,567 - - $1,900
22,567
kWh
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$6,770
Cost:
$1,990
- - $6,770 1,298 -
-
kWh
$6,770
1,298
MMBtu
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,390
Cost:
$1,000
- - $1,390 266 -
-
kWh
$1,390
266
MMBtu
08: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$24,470
Cost:
$53,000
- - $24,470 4,688 -
-
kWh
$24,470
4,688
MMBtu
09: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,010
Cost:
$6,240
- - $2,010 385 -
-
kWh
$2,010
385
MMBtu
TOTAL RECOMMENDED Savings:
$44,663
Cost:
$67,992
$10,023 118,406 $34,640 6,637 $10,023
118,406
kWh
$34,640
6,637
MMBtu
TOTAL IMPLEMENTED Savings:
$44,663
Cost:
$67,992
$10,023 118,406 $34,640 6,637 $10,023
118,406
kWh
$34,640
6,637
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas