IAC logo
IAC Assessment: GT0437
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0437
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1991
Principal Product CARPET YARN
NAICS n/a
SIC 2392 - Housefurnishings, Nec
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 6,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $511,782 9,619,871 kWh $0.05
Natural Gas $53,622 11,279 MMBtu $4.75
TOTAL ENERGY COSTS $565,404
RECOMMENDED SAVINGS* $30,812 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,812
#|Description Savings
Cost
Status Electricity Usage LPG Electricity Usage LPG
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,263
Cost:
$2,991
$8,263 155,334 - - $8,263
155,334
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,092
Cost:
$2,910
$1,092 20,516 - - $1,092
20,516
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,229
Cost:
$2,150
$2,229 41,911 - - $2,229
41,911
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,579
Cost:
-
$3,579 67,409 - - $3,579
67,409
kWh
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,861
Cost:
-
$9,599 180,539 $(-5,738) (-880) $9,599
180,539
kWh
$(-5,738)
(-880)
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,310
Cost:
-
$2,310 43,376 - - $2,310
43,376
kWh
-
-
MMBtu
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$9,478
Cost:
$1,000
$9,478 178,195 - - $9,478
178,195
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$30,812
Cost:
$9,051
$36,550 687,280 $(-5,738) (-880) $36,550
687,280
kWh
$(-5,738)
(-880)
MMBtu
TOTAL IMPLEMENTED Savings:
$30,812
Cost:
$9,051
$36,550 687,280 $(-5,738) (-880) $36,550
687,280
kWh
$(-5,738)
(-880)
MMBtu
Savings
Cost
$ kWh $ MMBtu