Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1991
Principal Product SNACK CHIPS
NAICS n/a
SIC 2096 - Potato Chips And Similar Snacks
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 23,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $432,766 8,156,507 kWh $0.05
Natural Gas $273,380 87,795 MMBtu $3.11
TOTAL ENERGY COSTS $706,146
RECOMMENDED SAVINGS* $28,127 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,380
Cost:
-
- - $9,980 3,210 $(-600) - -
-
kWh
$9,980
3,210
MMBtu
$(-600)
-
$
02: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$902
Cost:
-
- - $902 290 - - -
-
kWh
$902
290
MMBtu
-
-
$
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$10,480
Cost:
$3,670
- - $10,480 3,370 - - -
-
kWh
$10,480
3,370
MMBtu
-
-
$
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,450
Cost:
$425
- - $2,450 720 - - -
-
kWh
$2,450
720
MMBtu
-
-
$
05: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$1,030
Cost:
$4,500
- - $1,030 330 - - -
-
kWh
$1,030
330
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,350
Cost:
$2,570
$2,350 135,991 - - - - $2,350
135,991
kWh
-
-
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,535
Cost:
-
- - $1,835 590 $(-300) - -
-
kWh
$1,835
590
MMBtu
$(-300)
-
$
TOTAL RECOMMENDED Savings:
$28,127
Cost:
$11,165
$2,350 135,991 $26,677 8,510 $(-900) - $2,350
135,991
kWh
$26,677
8,510
MMBtu
$(-900)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes