IAC logo
IAC Assessment: GT0454
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0454
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1991
Principal Product WOODYARD CHIPPING SYSTEM
NAICS n/a
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 176
Plant Area (Sq.Ft.) 0
Annual Production 10 Pieces
Production Hrs. Annual 2,040
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $123,516 1,367,526 kWh $0.09
LPG $14,697 1,943 MMBtu $7.56
TOTAL ENERGY COSTS $138,213
RECOMMENDED SAVINGS* $4,992 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,992
#|Description Savings
Cost
Status Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$61
Cost:
$8,000
$215 2,638 - - $(-154) - $215
2,638
kWh
-
-
MMBtu
$(-154)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$489
Cost:
$11,450
$556 5,569 - - $(-67) - $556
5,569
kWh
-
-
MMBtu
$(-67)
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$130
Cost:
$5,350
$130 1,465 - - - - $130
1,465
kWh
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$104
Cost:
-
$104 1,172 - - - - $104
1,172
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,968
Cost:
$1,500
$1,968 22,860 - - - - $1,968
22,860
kWh
-
-
MMBtu
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,240
Cost:
$9,000
- - $2,240 - - - -
-
kWh
$2,240
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$4,992
Cost:
$35,300
$2,973 33,704 $2,240 - $(-221) - $2,973
33,704
kWh
$2,240
-
MMBtu
$(-221)
-
$
TOTAL IMPLEMENTED Savings:
$4,992
Cost:
$35,300
$2,973 33,704 $2,240 - $(-221) - $2,973
33,704
kWh
$2,240
-
MMBtu
$(-221)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes