IAC Center Georgia Institute of Technology
Assessment Year 1991
Principal Product WOODYARD CHIPPING SYSTEM
NAICS n/a
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 176
Plant Area (Sq.Ft.) 0
Annual Production 10 Pieces
Production Hrs. Annual 2,040
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $123,516 1,367,526 kWh $0.09
LPG $14,697 1,943 MMBtu $7.56
TOTAL ENERGY COSTS $138,213
RECOMMENDED SAVINGS* $4,992 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,992
#|Description Savings
Cost
Status Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$61
Cost:
$8,000
$215 2,638 - - $(-154) - $215
2,638
kWh
-
-
MMBtu
$(-154)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$489
Cost:
$11,450
$556 5,569 - - $(-67) - $556
5,569
kWh
-
-
MMBtu
$(-67)
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$130
Cost:
$5,350
$130 1,465 - - - - $130
1,465
kWh
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$104
Cost:
-
$104 1,172 - - - - $104
1,172
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,968
Cost:
$1,500
$1,968 22,860 - - - - $1,968
22,860
kWh
-
-
MMBtu
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,240
Cost:
$9,000
- - $2,240 - - - -
-
kWh
$2,240
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$4,992
Cost:
$35,300
$2,973 33,704 $2,240 - $(-221) - $2,973
33,704
kWh
$2,240
-
MMBtu
$(-221)
-
$
TOTAL IMPLEMENTED Savings:
$4,992
Cost:
$35,300
$2,973 33,704 $2,240 - $(-221) - $2,973
33,704
kWh
$2,240
-
MMBtu
$(-221)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes