IAC logo
IAC Assessment: GT0458
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0458
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1992
Principal Product VIDEO CASSETTE CASES
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 91
Plant Area (Sq.Ft.) 0
Annual Production 21,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $486,053 9,395,956 kWh $0.05
TOTAL ENERGY COSTS $486,053
RECOMMENDED SAVINGS* $41,480 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,480
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$580
Cost:
$1,740
$580 11,430 $580
11,430
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,900
Cost:
$10,600
$6,900 132,767 $6,900
132,767
kWh
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,000
Cost:
-
$1,000 19,637 $1,000
19,637
kWh
04: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$7,600
Cost:
-
$7,600 147,714 $7,600
147,714
kWh
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$3,200
Cost:
$700
$3,200 62,720 $3,200
62,720
kWh
06: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$3,200
Cost:
$10,500
$3,200 62,720 $3,200
62,720
kWh
07: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$19,000
Cost:
$7,320
$19,000 368,113 $19,000
368,113
kWh
TOTAL RECOMMENDED Savings:
$41,480
Cost:
$30,860
$41,480 805,101 $41,480
805,101
kWh
TOTAL IMPLEMENTED Savings:
$41,480
Cost:
$30,860
$41,480 805,101 $41,480
805,101
kWh