IAC Assessment: GT0461
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0461
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1992
Principal Product WET GROUND MICA
NAICS n/a
SIC 3295 - Minerals, Ground Or Treated
Sales $1,000,000-$5,000,000
# of Employees 52
Plant Area (Sq.Ft.) 0
Annual Production 5,000 Tons
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $367,746 6,561,548 kWh $0.06
LPG $41,358 4,761 MMBtu $8.69
TOTAL ENERGY COSTS $409,104
RECOMMENDED SAVINGS* $50,403 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,403
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,414
Cost:
$300
- - $5,714 1,147 $(-300) - -
-
kWh
$5,714
1,147
MMBtu
$(-300)
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,427
Cost:
$10,500
- - $4,427 889 - - -
-
kWh
$4,427
889
MMBtu
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$5,200
Cost:
$1,000
- - $5,200 1,044 - - -
-
kWh
$5,200
1,044
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$13,398
Cost:
$7,605
- - $13,398 2,690 - - -
-
kWh
$13,398
2,690
MMBtu
-
-
$
05: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$499
Cost:
-
- - $499 100 - - -
-
kWh
$499
100
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,164
Cost:
$2,200
$1,279 22,860 - - $(-115) - $1,279
22,860
kWh
-
-
MMBtu
$(-115)
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,618
Cost:
$78,930
$5,618 100,234 - - - - $5,618
100,234
kWh
-
-
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,010
Cost:
-
$7,010 125,147 - - - - $7,010
125,147
kWh
-
-
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,673
Cost:
$3,500
$7,673 137,163 - - - - $7,673
137,163
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$50,403
Cost:
$104,035
$21,580 385,404 $29,238 5,870 $(-415) - $21,580
385,404
kWh
$29,238
5,870
MMBtu
$(-415)
-
$
TOTAL IMPLEMENTED Savings:
$50,403
Cost:
$104,035
$21,580 385,404 $29,238 5,870 $(-415) - $21,580
385,404
kWh
$29,238
5,870
MMBtu
$(-415)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes