IAC logo
IAC Assessment: GT0462
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0462
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1992
Principal Product PRINTING INKS/VARNISHES
NAICS n/a
SIC 2893 - Printing Ink
Sales $10,000,000-$50,000,000
# of Employees 43
Plant Area (Sq.Ft.) 0
Annual Production 13,000,000 Pounds
Production Hrs. Annual 4,000
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,128 1,171,747 kWh $0.09
Natural Gas $20,772 3,657 MMBtu $5.68
TOTAL ENERGY COSTS $122,900
RECOMMENDED SAVINGS* $5,688 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$258
Cost:
$2,480
$315 3,810 $(-57) - $315
3,810
kWh
$(-57)
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,831
Cost:
$300
$3,831 43,962 - - $3,831
43,962
kWh
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$240
Cost:
$770
$240 2,638 - - $240
2,638
kWh
-
-
$
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$509
Cost:
$2,358
$509 5,862 - - $509
5,862
kWh
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$850
Cost:
$300
$850 9,672 - - $850
9,672
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$5,688
Cost:
$6,208
$5,745 65,944 $(-57) - $5,745
65,944
kWh
$(-57)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes