Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1993
Principal Product Flexible Packaging
NAICS n/a
SIC 2679 - Converted Paper Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 355
Plant Area (Sq.Ft.) 140,000
Annual Production 80,000,000 Thousand Feet
Production Hrs. Annual 7,344
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $648,319 12,616,647 kWh $0.05
Natural Gas $134,925 46,223 MMBtu $2.92
TOTAL ENERGY COSTS $783,244
RECOMMENDED SAVINGS* $66,400 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,425
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$500
Cost:
$1,000
$500 9,672 $500
9,672
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$680
Cost:
$1,470
$680 13,189 $680
13,189
kWh
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,260
Cost:
$57,715
$19,260 374,853 $19,260
374,853
kWh
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,600
Cost:
$1,550
$2,600 49,824 $2,600
49,824
kWh
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,970
Cost:
-
$3,970 77,081 $3,970
77,081
kWh
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$345
Cost:
$450
$345 6,741 $345
6,741
kWh
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$3,795
Cost:
-
$3,795 73,857 $3,795
73,857
kWh
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,540
Cost:
$4,000
$5,540 107,855 $5,540
107,855
kWh
09: 2.5194 REDESIGN PROCESS Savings:
$5,340
Cost:
$5,840
$5,340 104,338 $5,340
104,338
kWh
10: 2.5194 REDESIGN PROCESS Savings:
$24,370
Cost:
$42,000
$24,370 311,841 $24,370
311,841
kWh
TOTAL RECOMMENDED Savings:
$66,400
Cost:
$114,025
$66,400 1,129,251 $66,400
1,129,251
kWh
TOTAL IMPLEMENTED Savings:
$47,425
Cost:
$99,715
$47,425 760,551 $47,425
760,551
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage