IAC logo
IAC Assessment: GT0508
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0508
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1993
Principal Product Gas Cutting Apparatus
NAICS n/a
SIC 3548 - Welding Apparatus
Sales $10,000,000-$50,000,000
# of Employees 182
Plant Area (Sq.Ft.) 60,000
Annual Production 220,000 Pieces
Production Hrs. Annual 6,380
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $183,434 2,932,591 kWh $0.06
Natural Gas $7,586 1,571 MMBtu $4.83
TOTAL ENERGY COSTS $191,020
RECOMMENDED SAVINGS* $38,535 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,515
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,615
Cost:
$6,380
$4,615 73,857 $4,615
73,857
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,255
Cost:
$9,240
$3,255 52,169 $3,255
52,169
kWh
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$645
Cost:
$1,130
$645 10,258 $645
10,258
kWh
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,170
Cost:
$1,780
$1,170 18,757 $1,170
18,757
kWh
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$360
Cost:
-
$360 5,862 $360
5,862
kWh
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$9,590
Cost:
$7,800
$9,590 - $9,590
-
kWh
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$18,900
Cost:
$300
$18,900 - $18,900
-
kWh
TOTAL RECOMMENDED Savings:
$38,535
Cost:
$26,630
$38,535 160,903 $38,535
160,903
kWh
TOTAL IMPLEMENTED Savings:
$8,515
Cost:
$16,750
$8,515 136,284 $8,515
136,284
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage