IAC logo
IAC Assessment: GT0509
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0509
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1993
Principal Product Water Based Adhesives
NAICS n/a
SIC 2891 - Adhesives And Sealants
Sales $5,000,000-$10,000,000
# of Employees 19
Plant Area (Sq.Ft.) 26,000
Annual Production 18,000,000 Pieces
Production Hrs. Annual 2,860
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,529 305,100 kWh $0.10
Natural Gas $36,989 6,956 MMBtu $5.32
TOTAL ENERGY COSTS $68,518
RECOMMENDED SAVINGS* $9,077 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,034
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,748
Cost:
$4,884
$1,748 16,999 - - $1,748
16,999
kWh
-
-
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$473
Cost:
-
$473 4,689 - - $473
4,689
kWh
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$158
Cost:
$195
$158 1,465 - - $158
1,465
kWh
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,370
Cost:
$4,820
$1,370 13,189 - - $1,370
13,189
kWh
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$137
Cost:
-
$137 1,465 - - $137
1,465
kWh
-
-
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,569
Cost:
$450
- - $1,569 295 -
-
kWh
$1,569
295
MMBtu
07: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,341
Cost:
$21,050
- - $3,341 628 -
-
kWh
$3,341
628
MMBtu
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$281
Cost:
$9,800
$281 6,155 - - $281
6,155
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$9,077
Cost:
$41,199
$4,167 43,962 $4,910 923 $4,167
43,962
kWh
$4,910
923
MMBtu
TOTAL IMPLEMENTED Savings:
$7,034
Cost:
$36,120
$2,124 24,033 $4,910 923 $2,124
24,033
kWh
$4,910
923
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas