IAC Assessment: GT0521
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0521
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1994
Principal Product Polypropylene Carpet Yarn
NAICS n/a
SIC 2281 - Yarn Spinning Mills
Sales $1,000,000-$5,000,000
# of Employees 99
Plant Area (Sq.Ft.) 64,000
Annual Production 113,400 Thousand Feet
Production Hrs. Annual 8,664
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $653,536 9,648,007 kWh $0.07
Natural Gas $56,224 13,927 MMBtu $4.04
TOTAL ENERGY COSTS $709,760
RECOMMENDED SAVINGS* $42,220 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,800
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Consumption Electricity Usage Natural Gas Water Consumption
$ kWh $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,060
Cost:
$21,660
$10,060 148,593 - - - - $10,060
148,593
kWh
-
-
MMBtu
-
-
Tgal
02: 2.7122 DISCONNECT BALLASTS Savings:
$360
Cost:
$640
$360 5,275 - - - - $360
5,275
kWh
-
-
MMBtu
-
-
Tgal
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,620
Cost:
$17,130
$9,620 142,145 - - - - $9,620
142,145
kWh
-
-
MMBtu
-
-
Tgal
04: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$580
Cost:
$1,920
$580 8,499 - - - - $580
8,499
kWh
-
-
MMBtu
-
-
Tgal
05: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$6,070
Cost:
$4,600
- - - - $6,070 - -
-
kWh
-
-
MMBtu
$6,070
-
Tgal
06: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$200
Cost:
-
- - $200 51 - - -
-
kWh
$200
51
MMBtu
-
-
Tgal
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,770
Cost:
$13,000
- - $2,770 697 - - -
-
kWh
$2,770
697
MMBtu
-
-
Tgal
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$890
Cost:
$900
- - $890 224 - - -
-
kWh
$890
224
MMBtu
-
-
Tgal
09: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$11,670
Cost:
$700
- - $11,670 2,940 - - -
-
kWh
$11,670
2,940
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$42,220
Cost:
$60,550
$20,620 304,512 $15,530 3,912 $6,070 - $20,620
304,512
kWh
$15,530
3,912
MMBtu
$6,070
-
Tgal
TOTAL IMPLEMENTED Savings:
$32,800
Cost:
$41,030
$20,040 296,013 $12,760 3,215 - - $20,040
296,013
kWh
$12,760
3,215
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Consumption Electricity Usage Natural Gas Water Consumption