Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 1994 |
Principal Product | Ashaplt |
NAICS | n/a |
SIC | 2911 - Petroleum Refining |
Sales | $50,000,000-$100,000,000 |
# of Employees | 42 |
Plant Area (Sq.Ft.) | 10,000 |
Annual Production | 4,800,000 BBL |
Production Hrs. Annual | 7,224 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $302,920 | 5,939,918 | kWh | $0.05 |
Natural Gas | $1,807,067 | 614,501 | MMBtu | $2.94 |
LPG | $280,135 | 113,112 | MMBtu | $2.48 |
TOTAL ENERGY COSTS | $2,390,122 | |||
RECOMMENDED SAVINGS* | $119,525 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $28,220 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,820 Cost: $20,170 |
$4,820 | 94,666 | - | - |
$4,820 94,666 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $5,240 Cost: $800 |
- | - | $5,240 | 1,780 |
- - kWh |
$5,240 1,780 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $77,700 Cost: $212,000 |
- | - | $77,700 | 26,440 |
- - kWh |
$77,700 26,440 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $18,160 Cost: $13,550 |
- | - | $18,160 | 3,250 |
- - kWh |
$18,160 3,250 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,090 Cost: $2,665 |
- | - | $3,090 | 1,050 |
- - kWh |
$3,090 1,050 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2124 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK |
Savings: $8,610 Cost: $13,750 |
- | - | $8,610 | 2,930 |
- - kWh |
$8,610 2,930 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $1,905 Cost: $4,800 |
- | - | $1,905 | 648 |
- - kWh |
$1,905 648 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $119,525 Cost: $267,735 |
$4,820 | 94,666 | $114,705 | 36,098 | $4,820 94,666 kWh |
$114,705 36,098 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $28,220 Cost: $34,520 |
$4,820 | 94,666 | $23,400 | 5,030 | $4,820 94,666 kWh |
$23,400 5,030 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |