IAC logo
IAC Assessment: GT0566
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0566
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1995
Principal Product Bottled Soft Drinks
NAICS n/a
SIC 2086 - Bottled And Canned Soft Drinks
Sales $50,000,000-$100,000,000
# of Employees 116
Plant Area (Sq.Ft.) 200,000
Annual Production 1,152,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $641,429 12,391,266 kWh $0.05
Natural Gas $154,843 51,844 MMBtu $2.99
TOTAL ENERGY COSTS $876,867
RECOMMENDED SAVINGS* $102,598 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $89,538
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal
$ kWh $ MMBtu $ Tgal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,780
Cost:
$35,550
$3,780 71,805 - - - - $3,780
71,805
kWh
-
-
MMBtu
-
-
Tgal
02: 2.2221 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC Savings:
$81,900
Cost:
$80,000
- - $81,900 27,500 - - -
-
kWh
$81,900
27,500
MMBtu
-
-
Tgal
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$795
Cost:
$1,170
$795 14,947 - - - - $795
14,947
kWh
-
-
MMBtu
-
-
Tgal
04: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$10,700
Cost:
-
$10,700 468,933 - - - - $10,700
468,933
kWh
-
-
MMBtu
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,360
Cost:
$6,048
$2,360 52,755 - - - - $2,360
52,755
kWh
-
-
MMBtu
-
-
Tgal
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,940
Cost:
$3,560
$2,940 65,358 - - - - $2,940
65,358
kWh
-
-
MMBtu
-
-
Tgal
07: 3.4151 MINIMIZE WATER USAGE Savings:
$123
Cost:
$324
- - - - $123 90,900 -
-
kWh
-
-
MMBtu
$123
90,900
Tgal
TOTAL RECOMMENDED Savings:
$102,598
Cost:
$126,652
$20,575 673,798 $81,900 27,500 $123 90,900 $20,575
673,798
kWh
$81,900
27,500
MMBtu
$123
90,900
Tgal
TOTAL IMPLEMENTED Savings:
$89,538
Cost:
$120,604
$7,515 152,110 $81,900 27,500 $123 90,900 $7,515
152,110
kWh
$81,900
27,500
MMBtu
$123
90,900
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal