IAC logo
IAC Assessment: GT0576
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0576
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1995
Principal Product Conduit Seal
NAICS n/a
SIC 3568 - Power Transmission Equipment, Nec
Sales $500,000-$1,000,000
# of Employees 7
Plant Area (Sq.Ft.) 30,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 2,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,993 454,279 kWh $0.11
Natural Gas $731 120 MMBtu $6.09
TOTAL ENERGY COSTS $89,724
RECOMMENDED SAVINGS* $31,575 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,350
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)
$ kWh $ lb
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$6,700
Cost:
-
$6,700 - - - $6,700
-
kWh
-
-
lb
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$670
Cost:
$1,450
$670 35,170 - - $670
35,170
kWh
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$510
Cost:
$720
$510 4,689 - - $510
4,689
kWh
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,840
Cost:
$200
$2,840 25,205 - - $2,840
25,205
kWh
-
-
lb
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$20,855
Cost:
$66,000
$5,205 46,600 $15,650 21,300 $5,205
46,600
kWh
$15,650
21,300
lb
TOTAL RECOMMENDED Savings:
$31,575
Cost:
$68,370
$15,925 111,664 $15,650 21,300 $15,925
111,664
kWh
$15,650
21,300
lb
TOTAL IMPLEMENTED Savings:
$3,350
Cost:
$920
$3,350 29,894 - - $3,350
29,894
kWh
-
-
lb