IAC logo
IAC Assessment: GT0583
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0583
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1996
Principal Product Apparel
NAICS n/a
SIC 2322 - Men's and Boys' Underwear and Nightwear
Sales $10,000,000-$50,000,000
# of Employees 280
Plant Area (Sq.Ft.) 163,200
Annual Production 1,300,000 Pieces
Production Hrs. Annual 2,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $112,864 2,531,946 kWh $0.04
Electricity Demand $87,789 11,352 kW-months/year $7.73
Electricity Fees $10,033 - $ -
Natural Gas $2,024 256 MMBtu $7.91
TOTAL ENERGY COSTS $218,050
RECOMMENDED SAVINGS* $33,830 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,630
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ lb
01: 2.8112 COMBINE UTILITY METERS Savings:
$9,200
Cost:
$18,400
- - - - $9,200 - - - -
-
kWh
-
-
kW-months/year
$9,200
-
$
-
-
lb
02: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$17,420
Cost:
$15,000
$12,515 345,545 $4,075 527 $830 - - - $12,515
345,545
kWh
$4,075
527
kW-months/year
$830
-
$
-
-
lb
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$90
Cost:
$3,900
$44 879 $42 5 $4 - - - $44
879
kWh
$42
5
kW-months/year
$4
-
$
-
-
lb
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$200
Cost:
$360
$144 2,052 $46 6 $10 - - - $144
2,052
kWh
$46
6
kW-months/year
$10
-
$
-
-
lb
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$390
Cost:
$500
$201 3,810 $170 22 $19 - - - $201
3,810
kWh
$170
22
kW-months/year
$19
-
$
-
-
lb
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$390
Cost:
-
$270 7,034 $101 13 $19 - - - $270
7,034
kWh
$101
13
kW-months/year
$19
-
$
-
-
lb
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,860
Cost:
$3,000
$666 12,016 $534 69 $60 - $600 90 $666
12,016
kWh
$534
69
kW-months/year
$60
-
$
$600
90
lb
08: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$4,280
Cost:
$7,050
- - - - - - $4,280 230,000 -
-
kWh
-
-
kW-months/year
-
-
$
$4,280
230,000
lb
TOTAL RECOMMENDED Savings:
$33,830
Cost:
$48,210
$13,840 371,336 $4,968 642 $10,142 - $4,880 230,090 $13,840
371,336
kWh
$4,968
642
kW-months/year
$10,142
-
$
$4,880
230,090
lb
TOTAL IMPLEMENTED Savings:
$33,630
Cost:
$47,850
$13,696 369,284 $4,922 636 $10,132 - $4,880 230,090 $13,696
369,284
kWh
$4,922
636
kW-months/year
$10,132
-
$
$4,880
230,090
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)