IAC Assessment: GT0584
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0584
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1996
Principal Product Carpet
NAICS n/a
SIC 2273 - Carpets And Rugs
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 480,000
Annual Production 10,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $382,698 13,076,788 kWh $0.03
Electricity Fees $20,142 - $ -
Natural Gas $431,680 137,950 MMBtu $3.13
TOTAL ENERGY COSTS $834,520
RECOMMENDED SAVINGS* $256,090 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $76,820
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ $ $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,430
Cost:
$40,190
$8,008 274,619 $422 - - - - - $8,008
274,619
kWh
$422
-
$
-
-
MMBtu
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,510
Cost:
$22,150
$1,434 49,238 $76 - - - - - $1,434
49,238
kWh
$76
-
$
-
-
MMBtu
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,430
Cost:
$350
$2,308 78,839 $122 - - - - - $2,308
78,839
kWh
$122
-
$
-
-
MMBtu
-
-
lb
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$34,600
Cost:
$7,000
$32,870 1,122,509 $1,730 - - - - - $32,870
1,122,509
kWh
$1,730
-
$
-
-
MMBtu
-
-
lb
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$12,600
Cost:
-
$11,970 410,317 $630 - - - - - $11,970
410,317
kWh
$630
-
$
-
-
MMBtu
-
-
lb
06: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$52,000
Cost:
-
- - - - $52,000 - - - -
-
kWh
-
-
$
$52,000
-
MMBtu
-
-
lb
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$11,300
Cost:
-
- - - - $11,300 4,750 - - -
-
kWh
-
-
$
$11,300
4,750
MMBtu
-
-
lb
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,150
Cost:
-
$1,092 37,222 $58 - - - - - $1,092
37,222
kWh
$58
-
$
-
-
MMBtu
-
-
lb
09: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$8,890
Cost:
-
- - - - $8,890 3,220 - - -
-
kWh
-
-
$
$8,890
3,220
MMBtu
-
-
lb
10: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$123,180
Cost:
$600,000
- - - - - - $123,180 632,400 -
-
kWh
-
-
$
-
-
MMBtu
$123,180
632,400
lb
TOTAL RECOMMENDED Savings:
$256,090
Cost:
$669,690
$57,682 1,972,744 $3,038 - $72,190 7,970 $123,180 632,400 $57,682
1,972,744
kWh
$3,038
-
$
$72,190
7,970
MMBtu
$123,180
632,400
lb
TOTAL IMPLEMENTED Savings:
$76,820
Cost:
$62,690
$12,842 439,918 $678 - $63,300 4,750 - - $12,842
439,918
kWh
$678
-
$
$63,300
4,750
MMBtu
-
-
lb
Savings
Cost
$ kWh $ $ $ MMBtu $ lb
Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz)