IAC Assessment: GT0586
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0586
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1996
Principal Product Packaging Supplies
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 168
Plant Area (Sq.Ft.) 170,000
Annual Production 18,641,000 Pounds
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,751 4,357,269 kWh $0.02
Electricity Demand $160,706 10,223 kW-months/year $15.72
Electricity Fees $13,373 - $ -
Natural Gas $57,438 9,687 MMBtu $5.93
TOTAL ENERGY COSTS $343,168
RECOMMENDED SAVINGS* $65,706 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,485
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,450
Cost:
$19,650
$1,924 78,546 $2,322 148 $204 - - - - - $1,924
78,546
kWh
$2,322
148
kW-months/year
$204
-
$
-
-
MMBtu
-
-
lb
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$670
Cost:
$640
$294 12,016 $360 23 $16 - - - - - $294
12,016
kWh
$360
23
kW-months/year
$16
-
$
-
-
MMBtu
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$21,300
Cost:
$2,500
$9,119 372,216 $11,160 710 $1,021 - - - - - $9,119
372,216
kWh
$11,160
710
kW-months/year
$1,021
-
$
-
-
MMBtu
-
-
lb
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,390
Cost:
$900
- - - - - - $1,390 234 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,390
234
MMBtu
-
-
lb
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,100
Cost:
$5,200
$5,100 208,089 - - - - - - - - $5,100
208,089
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$20,711
Cost:
$16,120
$22,934 936,108 $28,079 1,786 - - $(-30,302) (-5,110) - - $22,934
936,108
kWh
$28,079
1,786
kW-months/year
-
-
$
$(-30,302)
(-5,110)
MMBtu
-
-
lb
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,060
Cost:
-
- - $1,008 36 $52 - - - - - -
-
kWh
$1,008
36
kW-months/year
$52
-
$
-
-
MMBtu
-
-
lb
08: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$11,025
Cost:
$4,850
- - - - - - - - $11,025 350,000 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$11,025
350,000
lb
TOTAL RECOMMENDED Savings:
$65,706
Cost:
$49,860
$39,371 1,606,975 $42,929 2,703 $1,293 - $(-28,912) (-4,876) $11,025 350,000 $39,371
1,606,975
kWh
$42,929
2,703
kW-months/year
$1,293
-
$
$(-28,912)
(-4,876)
MMBtu
$11,025
350,000
lb
TOTAL IMPLEMENTED Savings:
$39,485
Cost:
$14,090
$14,513 592,321 $11,520 733 $1,037 - $1,390 234 $11,025 350,000 $14,513
592,321
kWh
$11,520
733
kW-months/year
$1,037
-
$
$1,390
234
MMBtu
$11,025
350,000
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)