IAC logo
IAC Assessment: GT0590
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0590
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1996
Principal Product Specialty Chemicals
NAICS n/a
SIC 2861 - Gum And Wood Chemicals
Sales $50,000,000-$100,000,000
# of Employees 140
Plant Area (Sq.Ft.) 500,000
Annual Production 24,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $360,379 12,052,755 kWh $0.03
Electricity Demand $187,190 21,868 kW-months/year $8.56
Electricity Fees $35,621 - $ -
Natural Gas $543,435 151,909 MMBtu $3.58
Other Energy $1,045,416 384,345 MMBtu $2.72
TOTAL ENERGY COSTS $2,820,041
RECOMMENDED SAVINGS* $216,881 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $147,111
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Energy Water Disposal Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Energy Water Disposal Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ Tgal $ Tgal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$19,170
Cost:
$116,000
$12,575 420,574 $5,506 643 $1,089 - - - - - - - - - $12,575
420,574
kWh
$5,506
643
kW-months/year
$1,089
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$30,732
Cost:
$2,000
- - - - - - $29,100 10,699 - - $1,224 815,780 $408 - -
-
kWh
-
-
kW-months/year
-
-
$
$29,100
10,699
MMBtu
-
-
MMBtu
$1,224
815,780
Tgal
$408
-
Tgal
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$11,040
Cost:
$8,800
$7,265 242,966 $3,154 368 $621 - - - - - - - - - $7,265
242,966
kWh
$3,154
368
kW-months/year
$621
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
04: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$40,100
Cost:
$30,000
- - - - - - $40,100 11,200 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$40,100
11,200
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$38,880
Cost:
$60,000
- - - - - - $38,880 10,860 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$38,880
10,860
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
06: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$18,987
Cost:
$400
- - - - - - - - $17,700 6,500 $965 643,000 $322 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$17,700
6,500
MMBtu
$965
643,000
Tgal
$322
-
Tgal
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$680
Cost:
$218
$360 12,016 $291 34 $29 - - - - - - - - - $360
12,016
kWh
$291
34
kW-months/year
$29
-
$
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
Tgal
08: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$22,680
Cost:
$2,500
- - - - - - - - $2,520 925 $15,120 10,080,000 $5,040 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,520
925
MMBtu
$15,120
10,080,000
Tgal
$5,040
-
Tgal
09: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$34,612
Cost:
$31,200
- - - - - - - - $21,800 8,000 $9,609 6,406,000 $3,203 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$21,800
8,000
MMBtu
$9,609
6,406,000
Tgal
$3,203
-
Tgal
TOTAL RECOMMENDED Savings:
$216,881
Cost:
$251,118
$20,200 675,556 $8,951 1,045 $1,739 - $108,080 32,759 $42,020 15,425 $26,918 17,944,780 $8,973 - $20,200
675,556
kWh
$8,951
1,045
kW-months/year
$1,739
-
$
$108,080
32,759
MMBtu
$42,020
15,425
MMBtu
$26,918
17,944,780
Tgal
$8,973
-
Tgal
TOTAL IMPLEMENTED Savings:
$147,111
Cost:
$66,100
- - - - - - $69,200 21,899 $42,020 15,425 $26,918 17,944,780 $8,973 - -
-
kWh
-
-
kW-months/year
-
-
$
$69,200
21,899
MMBtu
$42,020
15,425
MMBtu
$26,918
17,944,780
Tgal
$8,973
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ Tgal $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Energy Water Disposal Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Energy Water Disposal Water Consumption