IAC logo
IAC Assessment: GT0607
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0607
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1997
Principal Product yarn
NAICS n/a
SIC 2281 - Yarn Spinning Mills
Sales $10,000,000-$50,000,000
# of Employees 117
Plant Area (Sq.Ft.) 157,500
Annual Production 7,500,000 Pounds
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $309,989 5,588,511 kWh $0.06
Electricity Demand $88,404 14,660 kW-months/year $6.03
Fuel Oil #6 $2,815 428 MMBtu $6.58
TOTAL ENERGY COSTS $582,362
RECOMMENDED SAVINGS* $179,849 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $172,767
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost Water Consumption Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost Water Consumption Increase in Production
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ Tgal $ %
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,960
Cost:
$62,150
$7,591 137,163 $1,809 300 $560 - - - - - - - - - - - $7,591
137,163
kWh
$1,809
300
kW-months/year
$560
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
Tgal
-
-
%
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,502
Cost:
$5,320
$5,029 90,856 $1,105 183 $368 - - - - - - - - - - - $5,029
90,856
kWh
$1,105
183
kW-months/year
$368
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
Tgal
-
-
%
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,568
Cost:
$29,830
$15,330 276,377 $4,074 676 $1,164 - - - - - - - - - - - $15,330
276,377
kWh
$4,074
676
kW-months/year
$1,164
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
Tgal
-
-
%
04: 3.4155 METER WASTE WATER Savings:
$580
Cost:
-
- - - - - - - - - - - - $580 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$580
-
Tgal
-
-
%
05: 3.7221 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL Savings:
$90,000
Cost:
$21,000
- - - - - - - - $90,000 75,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$90,000
75,000
lb
-
-
$
-
-
Tgal
-
-
%
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$9,086
Cost:
$15,000
$7,122 128,370 $1,450 240 $514 - - - - - - - - - - - $7,122
128,370
kWh
$1,450
240
kW-months/year
$514
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
Tgal
-
-
%
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$12,924
Cost:
$13,000
$14,977 269,930 $3,107 515 - - $(-5,160) (-1,330) - - - - - - - - $14,977
269,930
kWh
$3,107
515
kW-months/year
-
-
$
$(-5,160)
(-1,330)
MMBtu
-
-
lb
-
-
$
-
-
Tgal
-
-
%
08: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$30,229
Cost:
$18,000
$4,099 73,857 $890 141 - - - - - - $1,240 - - - $24,000 - $4,099
73,857
kWh
$890
141
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$1,240
-
$
-
-
Tgal
$24,000
-
%
TOTAL RECOMMENDED Savings:
$179,849
Cost:
$164,300
$54,148 976,553 $12,435 2,055 $2,606 - $(-5,160) (-1,330) $90,000 75,000 $1,240 - $580 - $24,000 - $54,148
976,553
kWh
$12,435
2,055
kW-months/year
$2,606
-
$
$(-5,160)
(-1,330)
MMBtu
$90,000
75,000
lb
$1,240
-
$
$580
-
Tgal
$24,000
-
%
TOTAL IMPLEMENTED Savings:
$172,767
Cost:
$158,980
$49,119 885,697 $11,330 1,872 $2,238 - $(-5,160) (-1,330) $90,000 75,000 $1,240 - - - $24,000 - $49,119
885,697
kWh
$11,330
1,872
kW-months/year
$2,238
-
$
$(-5,160)
(-1,330)
MMBtu
$90,000
75,000
lb
$1,240
-
$
-
-
Tgal
$24,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ Tgal $ %
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost Water Consumption Increase in Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost Water Consumption Increase in Production