IAC Assessment: GT0617
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0617
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1997
Principal Product Joint Compound
NAICS n/a
SIC 2891 - Adhesives And Sealants
Sales $10,000,000-$50,000,000
# of Employees 67
Plant Area (Sq.Ft.) 70,000
Annual Production 261,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,057 2,859,613 kWh $0.02
Electricity Demand $95,062 5,966 kW-months/year $15.93
Electricity Fees $10,133 - $ -
TOTAL ENERGY COSTS $175,212
RECOMMENDED SAVINGS* $281,772 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,133
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$564
Cost:
$4,997
$172 7,327 $365 23 $27 - - - - - - - $172
7,327
kWh
$365
23
kW-months/year
$27
-
$
-
-
lb
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,920
Cost:
$2,120
$552 24,033 $1,277 80 $91 - - - - - - - $552
24,033
kWh
$1,277
80
kW-months/year
$91
-
$
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,899
Cost:
$450
$2,112 91,442 $2,554 160 $233 - - - - - - - $2,112
91,442
kWh
$2,554
160
kW-months/year
$233
-
$
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,314
Cost:
$7,680
$2,364 102,286 $3,649 229 $301 - - - - - - - $2,364
102,286
kWh
$3,649
229
kW-months/year
$301
-
$
-
-
lb
-
-
$
-
-
$
05: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$139,500
Cost:
$155,000
- - - - - - $700 176,357 - - $138,800 - -
-
kWh
-
-
kW-months/year
-
-
$
$700
176,357
lb
-
-
$
$138,800
-
$
06: 3.7212 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) Savings:
$3,175
Cost:
$2,800
- - - - - - - - - - $3,175 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
$3,175
-
$
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$125,400
Cost:
$150,000
- - - - - - - - $125,400 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$125,400
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$281,772
Cost:
$323,047
$5,200 225,088 $7,845 492 $652 - $700 176,357 $125,400 - $141,975 - $5,200
225,088
kWh
$7,845
492
kW-months/year
$652
-
$
$700
176,357
lb
$125,400
-
$
$141,975
-
$
TOTAL IMPLEMENTED Savings:
$13,133
Cost:
$10,250
$5,028 217,761 $7,480 469 $625 - - - - - - - $5,028
217,761
kWh
$7,480
469
kW-months/year
$625
-
$
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Primary Raw Material