IAC logo
IAC Assessment: GT0634
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0634
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1998
Principal Product Hot Melt Adhesives
NAICS n/a
SIC 2891 - Adhesives And Sealants
Sales $1,000,000-$5,000,000
# of Employees 16
Plant Area (Sq.Ft.) 10,000
Annual Production 4,000,000 Pounds
Production Hrs. Annual 2,500
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,810 184,642 kWh $0.03
Electricity Demand $8,867 491 kW-months/year $18.06
Electricity Fees $877 - $ -
Natural Gas $96,165 15,773 MMBtu $6.10
TOTAL ENERGY COSTS $110,719
RECOMMENDED SAVINGS* $8,752 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,232
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$290
Cost:
$800
$290 15,240 - - - - - - - - $290
15,240
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,600
Cost:
$840
- - - - $1,600 262 - - - - -
-
kWh
-
-
kW-months/year
$1,600
262
MMBtu
-
-
$
-
-
$
03: 2.7314 REDUCE VENTILATION AIR Savings:
$1,900
Cost:
$2,000
- - - - $1,900 312 - - - - -
-
kWh
-
-
kW-months/year
$1,900
312
MMBtu
-
-
$
-
-
$
04: 2.2514 COVER OPEN TANKS Savings:
$80
Cost:
$300
- - - - $80 14 - - - - -
-
kWh
-
-
kW-months/year
$80
14
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$932
Cost:
$3,180
$347 13,189 $585 32 - - - - - - $347
13,189
kWh
$585
32
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$1,220
Cost:
-
- - - - $2,120 347 $(-900) - - - -
-
kWh
-
-
kW-months/year
$2,120
347
MMBtu
$(-900)
-
$
-
-
$
07: 4.2130 PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING Savings:
$2,730
Cost:
$780
- - - - - - - - $2,730 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$2,730
-
$
TOTAL RECOMMENDED Savings:
$8,752
Cost:
$7,900
$637 28,429 $585 32 $5,700 935 $(-900) - $2,730 - $637
28,429
kWh
$585
32
kW-months/year
$5,700
935
MMBtu
$(-900)
-
$
$2,730
-
$
TOTAL IMPLEMENTED Savings:
$2,232
Cost:
$3,480
$347 13,189 $585 32 $2,200 361 $(-900) - - - $347
13,189
kWh
$585
32
kW-months/year
$2,200
361
MMBtu
$(-900)
-
$
-
-
$