IAC Assessment: GT0646
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0646
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1998
Principal Product Computer Monitors
NAICS n/a
SIC 3575 - Computer Terminals
Sales >$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 290,000
Annual Production 1,300,000 Pieces
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,392 3,920,868 kWh $0.03
Electricity Demand $147,916 13,374 kW-months/year $11.06
Electricity Fees $71,087 - $ -
Natural Gas $41,348 7,052 MMBtu $5.86
TOTAL ENERGY COSTS $1,684,278
RECOMMENDED SAVINGS* $161,896 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,980
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,713
Cost:
$22,000
$3,648 144,783 $5,065 458 - - - - - - - - $3,648
144,783
kWh
$5,065
458
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 3.4155 METER WASTE WATER Savings:
$1,215
Cost:
$1,500
- - - - - - $1,215 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,215
-
Tgal
-
-
lb
-
-
$
03: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$108,000
Cost:
-
- - - - - - - - $108,000 3,600,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$108,000
3,600,000
lb
-
-
$
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,020
Cost:
$2,700
- - $2,020 183 - - - - - - - - -
-
kWh
$2,020
183
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,730
Cost:
$10,050
$2,730 108,441 - - - - - - - - - - $2,730
108,441
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,230
Cost:
$400
$1,230 48,652 - - - - - - - - - - $1,230
48,652
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
07: 4.4540 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$37,988
Cost:
-
$3,288 130,422 - - $3,500 597 - - - - $31,200 - $3,288
130,422
kWh
-
-
kW-months/year
$3,500
597
MMBtu
-
-
Tgal
-
-
lb
$31,200
-
$
TOTAL RECOMMENDED Savings:
$161,896
Cost:
$36,650
$10,896 432,298 $7,085 641 $3,500 597 $1,215 - $108,000 3,600,000 $31,200 - $10,896
432,298
kWh
$7,085
641
kW-months/year
$3,500
597
MMBtu
$1,215
-
Tgal
$108,000
3,600,000
lb
$31,200
-
$
TOTAL IMPLEMENTED Savings:
$5,980
Cost:
$13,150
$3,960 157,093 $2,020 183 - - - - - - - - $3,960
157,093
kWh
$2,020
183
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes