IAC logo
IAC Assessment: GT0649
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0649
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1998
Principal Product Carpet Backing
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 36
Plant Area (Sq.Ft.) 59,000
Annual Production 45,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,284 2,303,927 kWh $0.02
Electricity Demand $29,088 6,060 kW-months/year $4.80
Electricity Fees $6,529 - $ -
Natural Gas $251,019 53,490 MMBtu $4.69
LPG $5,254 539 MMBtu $9.75
TOTAL ENERGY COSTS $355,054
RECOMMENDED SAVINGS* $371,288 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ $ $ Tgal
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$66,324
Cost:
$81,400
- - - - - - - - - - - - $66,324 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
$66,324
-
$
-
-
Tgal
02: 2.8112 COMBINE UTILITY METERS Savings:
$2,240
Cost:
-
- - - - - - - - - - - - $2,240 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
$2,240
-
$
-
-
Tgal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,648
Cost:
$1,050
$916 48,359 $639 132 $93 - - - - - - - - - - - $916
48,359
kWh
$639
132
kW-months/year
$93
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
Tgal
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,426
Cost:
$150
$896 47,479 $449 94 $81 - - - - - - - - - - - $896
47,479
kWh
$449
94
kW-months/year
$81
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
Tgal
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,544
Cost:
$17,439
$980 51,583 $518 108 $46 - - - - - - - - - - - $980
51,583
kWh
$518
108
kW-months/year
$46
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
Tgal
06: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$289,504
Cost:
$27,000
$4,596 230,363 - - - - $25,086 5,349 - - $259,200 - - - $622 - $4,596
230,363
kWh
-
-
kW-months/year
-
-
$
$25,086
5,349
MMBtu
-
-
gal
$259,200
-
$
-
-
$
$622
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,456
Cost:
$6,189
$912 48,066 $461 96 $83 - - - - - - - - - - - $912
48,066
kWh
$461
96
kW-months/year
$83
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
Tgal
08: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$3,046
Cost:
-
$(-1,425) (-75,029) $(-720) (-150) $(-129) - - - - - - - - - $5,320 - $(-1,425)
(-75,029)
kWh
$(-720)
(-150)
kW-months/year
$(-129)
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$5,320
-
Tgal
09: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS Savings:
$4,100
Cost:
$1,000
- - - - - - - - $4,100 7,273 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$4,100
7,273
gal
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$371,288
Cost:
$134,228
$6,875 350,821 $1,347 280 $174 - $25,086 5,349 $4,100 7,273 $259,200 - $68,564 - $5,942 - $6,875
350,821
kWh
$1,347
280
kW-months/year
$174
-
$
$25,086
5,349
MMBtu
$4,100
7,273
gal
$259,200
-
$
$68,564
-
$
$5,942
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (non-haz) Personnel Changes Administrative Changes Water Consumption