IAC logo
IAC Assessment: GT0651
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0651
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1998
Principal Product hand tools
NAICS n/a
SIC 3421 - Cutlery
Sales $50,000,000-$100,000,000
# of Employees 320
Plant Area (Sq.Ft.) 250,000
Annual Production 5,800,000 Pieces
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $605,580 18,924,385 kWh $0.03
Electricity Demand $276,145 24,959 kW-months/year $11.06
Electricity Fees $52,903 - $ -
Natural Gas $112,056 24,259 MMBtu $4.62
TOTAL ENERGY COSTS $1,059,478
RECOMMENDED SAVINGS* $172,665 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,260
Cost:
$3,100
$17,226 538,394 - - $1,034 - - - - - - - - - $17,226
538,394
kWh
-
-
kW-months/year
$1,034
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.2514 COVER OPEN TANKS Savings:
$21,415
Cost:
$6,174
$11,023 436,694 $9,179 831 $1,213 - - - - - - - - - $11,023
436,694
kWh
$9,179
831
kW-months/year
$1,213
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,874
Cost:
$52,766
$3,533 139,801 $2,952 267 $389 - - - - - - - - - $3,533
139,801
kWh
$2,952
267
kW-months/year
$389
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,505
Cost:
$3,933
$774 30,481 $646 58 $85 - - - - - - - - - $774
30,481
kWh
$646
58
kW-months/year
$85
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,004
Cost:
$413
- - - - - - $1,004 107 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,004
107
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$16,208
Cost:
$38,860
- - - - - - - - $3,028 208,800 $13,180 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$3,028
208,800
lb
$13,180
-
$
-
-
$
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,099
Cost:
-
- - - - - - - - $699 150,000 $1,400 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$699
150,000
lb
$1,400
-
$
-
-
$
08: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$105,300
Cost:
$120,000
- - - - - - - - - - - - $105,300 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$105,300
-
$
TOTAL RECOMMENDED Savings:
$172,665
Cost:
$225,246
$32,556 1,145,370 $12,777 1,156 $2,721 - $1,004 107 $3,727 358,800 $14,580 - $105,300 - $32,556
1,145,370
kWh
$12,777
1,156
kW-months/year
$2,721
-
$
$1,004
107
MMBtu
$3,727
358,800
lb
$14,580
-
$
$105,300
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product