IAC Assessment: GT0652
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0652
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1998
Principal Product Windup clocks
NAICS n/a
SIC 3873 - Watches, Clocks, Watchcases & Parts
Sales $100,000,000-$500,000,000
# of Employees 650
Plant Area (Sq.Ft.) 331,000
Annual Production 12,500,000 Pieces
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $316,734 11,517,585 kWh $0.03
Electricity Demand $338,371 28,160 kW-months/year $12.02
Electricity Fees $55,383 - $ -
Natural Gas $58,932 9,603 MMBtu $6.14
TOTAL ENERGY COSTS $821,462
RECOMMENDED SAVINGS* $74,003 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Water Disposal Solid Waste (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Water Disposal Solid Waste (haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$9,935
Cost:
-
- - $151,342 13,200 - - $(-73,656) (-682) - - - - $(-15,345) - $(-52,406) - -
-
kWh
$151,342
13,200
kW-months/year
-
-
MMBtu
$(-73,656)
(-682)
MMBtu
-
-
Tgal
-
-
lb
$(-15,345)
-
$
$(-52,406)
-
$
02: 3.4155 METER WASTE WATER Savings:
$6,890
Cost:
$1,000
- - - - - - - - - - - - - - $6,890 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$6,890
-
$
03: 2.2111 INSTALL STEAM TRAP Savings:
$2,103
Cost:
$2,800
- - - - $2,010 329 - - $93 25,354 - - - - - - -
-
kWh
-
-
kW-months/year
$2,010
329
MMBtu
-
-
MMBtu
$93
25,354
Tgal
-
-
lb
-
-
$
-
-
$
04: 4.4220 UTILIZE OUTSIDE CONTRACTING Savings:
$4,345
Cost:
-
$908 33,118 - - $7,056 1,086 - - - - - - $20,686 - $(-24,305) - $908
33,118
kWh
-
-
kW-months/year
$7,056
1,086
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
$20,686
-
$
$(-24,305)
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$10,000
Cost:
$250
- - - - - - - - - - $10,000 2,694 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$10,000
2,694
lb
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,300
Cost:
-
$3,300 119,871 - - - - - - - - - - - - - - $3,300
119,871
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$37,430
Cost:
$130,994
$12,914 469,519 $24,516 2,040 - - - - - - - - - - - - $12,914
469,519
kWh
$24,516
2,040
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$74,003
Cost:
$135,044
$17,122 622,508 $175,858 15,240 $9,066 1,415 $(-73,656) (-682) $93 25,354 $10,000 2,694 $5,341 - $(-69,821) - $17,122
622,508
kWh
$175,858
15,240
kW-months/year
$9,066
1,415
MMBtu
$(-73,656)
(-682)
MMBtu
$93
25,354
Tgal
$10,000
2,694
lb
$5,341
-
$
$(-69,821)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Water Disposal Solid Waste (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Water Disposal Solid Waste (haz) Personnel Changes Administrative Changes