IAC Center | Georgia Institute of Technology |
---|---|
Assessment Year | 1998 |
Principal Product | Windup clocks |
NAICS | n/a |
SIC | 3873 - Watches, Clocks, Watchcases & Parts |
Sales | $100,000,000-$500,000,000 |
# of Employees | 650 |
Plant Area (Sq.Ft.) | 331,000 |
Annual Production | 12,500,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $316,734 | 11,517,585 | kWh | $0.03 |
Electricity Demand | $338,371 | 28,160 | kW-months/year | $12.02 |
Electricity Fees | $55,383 | - | $ | - |
Natural Gas | $58,932 | 9,603 | MMBtu | $6.14 |
TOTAL ENERGY COSTS | $821,462 | |||
RECOMMENDED SAVINGS* | $74,003 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Water Disposal | Solid Waste (haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Water Disposal | Solid Waste (haz) | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $9,935 Cost: - |
- | - | $151,342 | 13,200 | - | - | $(-73,656) | (-682) | - | - | - | - | $(-15,345) | - | $(-52,406) | - |
- - kWh |
$151,342 13,200 kW-months/year |
- - MMBtu |
$(-73,656) (-682) MMBtu |
- - Tgal |
- - lb |
$(-15,345) - $ |
$(-52,406) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4155 METER WASTE WATER |
Savings: $6,890 Cost: $1,000 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | $6,890 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
$6,890 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2111 INSTALL STEAM TRAP |
Savings: $2,103 Cost: $2,800 |
- | - | - | - | $2,010 | 329 | - | - | $93 | 25,354 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,010 329 MMBtu |
- - MMBtu |
$93 25,354 Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.4220 UTILIZE OUTSIDE CONTRACTING |
Savings: $4,345 Cost: - |
$908 | 33,118 | - | - | $7,056 | 1,086 | - | - | - | - | - | - | $20,686 | - | $(-24,305) | - |
$908 33,118 kWh |
- - kW-months/year |
$7,056 1,086 MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
$20,686 - $ |
$(-24,305) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $10,000 Cost: $250 |
- | - | - | - | - | - | - | - | - | - | $10,000 | 2,694 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
$10,000 2,694 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,300 Cost: - |
$3,300 | 119,871 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$3,300 119,871 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $37,430 Cost: $130,994 |
$12,914 | 469,519 | $24,516 | 2,040 | - | - | - | - | - | - | - | - | - | - | - | - |
$12,914 469,519 kWh |
$24,516 2,040 kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $74,003 Cost: $135,044 |
$17,122 | 622,508 | $175,858 | 15,240 | $9,066 | 1,415 | $(-73,656) | (-682) | $93 | 25,354 | $10,000 | 2,694 | $5,341 | - | $(-69,821) | - | $17,122 622,508 kWh |
$175,858 15,240 kW-months/year |
$9,066 1,415 MMBtu |
$(-73,656) (-682) MMBtu |
$93 25,354 Tgal |
$10,000 2,694 lb |
$5,341 - $ |
$(-69,821) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Water Disposal | Solid Waste (haz) | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Water Disposal | Solid Waste (haz) | Personnel Changes | Administrative Changes |