IAC Assessment: GT0657
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0657
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1999
Principal Product Aircaft Parts
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales n/a
# of Employees 440
Plant Area (Sq.Ft.) 181,890
Annual Production 12 Pounds
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,945 6,185,815 kWh $0.03
Electricity Demand $95,256 6,000 kW-months/year $15.88
Electricity Fees $5,455 - $ -
Natural Gas $128,054 21,270 MMBtu $6.02
TOTAL ENERGY COSTS $516,127
RECOMMENDED SAVINGS* $277,779 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Solid Waste (haz) Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Solid Waste (haz) Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ lb $ $ $ $ $ $ $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$53,008
Cost:
$75,650
- - - - - - - - $(-5,108) (-1,684) - - $58,116 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$(-5,108)
(-1,684)
MMBtu
-
-
lb
$58,116
-
$
-
-
$
-
-
$
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$12,270
Cost:
$5,000
$11,467 60,961 - - $803 - - - - - - - - - - - - - - - $11,467
60,961
kWh
-
-
kW-months/year
$803
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
03: 3.4155 METER WASTE WATER Savings:
$2,793
Cost:
$200
- - - - - - - - - - - - $2,793 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
$2,793
-
$
-
-
$
-
-
$
-
-
$
04: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$23,418
Cost:
$1,000
- - - - - - - - - - $2,400 318 $19,718 - $1,300 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$2,400
318
lb
$19,718
-
$
$1,300
-
$
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,997
Cost:
$160
$2,801 87,925 - - $196 - - - - - - - - - - - - - - - $2,801
87,925
kWh
-
-
kW-months/year
$196
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,779
Cost:
$400
$979 29,894 $684 45 $116 - - - - - - - - - - - - - - - $979
29,894
kWh
$684
45
kW-months/year
$116
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,617
Cost:
$25,504
$3,901 121,923 $4,152 263 $564 - - - - - - - - - - - - - - - $3,901
121,923
kWh
$4,152
263
kW-months/year
$564
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
08: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$94,225
Cost:
$35,250
$8,467 264,654 - - $593 - $49,165 8,167 - - - - - - - - - - $36,000 - $8,467
264,654
kWh
-
-
kW-months/year
$593
-
$
$49,165
8,167
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
$36,000
-
$
09: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$65,262
Cost:
-
- - - - - - - - - - $60,462 8,021 - - $4,800 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$60,462
8,021
lb
-
-
$
$4,800
-
$
-
-
$
-
-
$
10: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$13,410
Cost:
$2,400
$4,224 131,887 $3,636 229 $550 - - - - - - - - - - - $5,000 - - - $4,224
131,887
kWh
$3,636
229
kW-months/year
$550
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$5,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$277,779
Cost:
$145,564
$31,839 697,244 $8,472 537 $2,822 - $49,165 8,167 $(-5,108) (-1,684) $62,862 8,339 $80,627 - $6,100 - $5,000 - $36,000 - $31,839
697,244
kWh
$8,472
537
kW-months/year
$2,822
-
$
$49,165
8,167
MMBtu
$(-5,108)
(-1,684)
MMBtu
$62,862
8,339
lb
$80,627
-
$
$6,100
-
$
$5,000
-
$
$36,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Solid Waste (haz) Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas LPG Solid Waste (haz) Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Primary Product